background image

 

©

 Rugged Interactive 

2021

 

 

 

 

NinjaPods 

Order and Installation Manual 

For models from February 2021 onwards 

 
 
 

 

 

 
 
 
 
 
 
 
 
 
 
 
 

 

Rugged Interactive 

Unit 1, Callywith Court 

Callywith Industrial Estate , Bodmin 

 Cornwall, UK 

PL231 2RQ 

 

+

44 (0) 1726 981 123 

www.rugged

-

interactive.co.uk 

hello@rugged

-

interactive.co.uk

 

 

 

Updated: 02/02/2021 

Содержание NinjaPods

Страница 1: ...allation Manual For models from February 2021 onwards Rugged Interactive Unit 1 Callywith Court Callywith Industrial Estate Bodmin Cornwall UK PL231 2RQ 44 0 1726 981 123 www rugged interactive co uk...

Страница 2: ...er and Installation Checklist 1 3 Product Overview 1 4 Ordering and Installation Timeline 1 5 Getting Started 1 6 Place Order Section 2 Safety Guidelines 2 1 Installation Safety Guidelines 2 2 In Play...

Страница 3: ...provide guidance only the installation of the Rugged Interactive product will be under your control You will be responsible for making sure upon completion of the installation it is safe to use As alw...

Страница 4: ...5 weeks VAT number required for export customers Complete site survey Send purchase order or confirm order Make first payment Discuss graphic requirements and provide logos and branding guidelines App...

Страница 5: ...s With two game modes Cascade and Chaser x4 users can play as one big team or split into 4 teams A live scoreboard keeps players up to date with the score and at the end of the game time the score or...

Страница 6: ...and CAD files can be supplied upon request Existing Parks When retrofitting existing parks all specifications can be found within this manual or CAD files are available at request If further informati...

Страница 7: ...ts weight and gameplay If possible avoid stud walls or unsupported portal infills If in doubt always contact a suitably qualified surveyor to check Visually check the product for any signs of damage c...

Страница 8: ...ncerns e g loose or damaged equipment to a member of staff immediately Ensure you familiarise yourself with any additional facility rules that may apply Ensure that the play area is clear before attem...

Страница 9: ...ather soles high heels sandals boots or bare feet No food drink or chewing gum during participation No phones or cameras in the activity area Do not leave clothing or personal belongings around the ac...

Страница 10: ...tion 3 1 Parts List Please check off the received parts for the installation and alert Rugged Interactive immediately if anything is missing 9 16 x Pods in moulding 9 16 x Pod mounting plates 36 64 x...

Страница 11: ...2 Tools and Components List Arrange the necessary tools and the team to install the product Ladder Jigsaw Hole saw Industrial vacuum cleaner Dustpan and brush SDS impact drill Cordless drill with torq...

Страница 12: ...f this prior to beginning the installation and if you are in any doubt contact Rugged Interactive If you have any concerns on how or what the product is installed to contact a structural engineer prio...

Страница 13: ...y from contact with water IMPORTANT Take anti static precautions Structure Mount onto a suitable surface Pods should be installed to round or square metal poles prior to vinyl or padding being added S...

Страница 14: ...Installation Rugged Interactive 2021 Other Recommendations Instruction training carried out by an appropriate instructor to all new users A waiting spectating area positioned nearby is advised IF YOU...

Страница 15: ...wer sockets The Control Box also contains the HUB that controls the pods and the control system requires 1 power socket per HUB box Fix the control box using any suitable self tapping or wood screws i...

Страница 16: ...added to the piping The pods can be installed to either box or round piping and feature a cut out on the rear for each Pods are connected to the HUBs via CAT5 cables 01 02 Each pod will be supplied w...

Страница 17: ...in place Connect appropriate length CAT5 cable to the pod s hanging cable that will return to the Control box Tuck the hanging cable and head of the CAT5 cable inside the recess in the pod Cable exce...

Страница 18: ...ioned in easily visible positions that users will not make contact with The screens are connected to a small splitter via HDMI the splitter will need to connect via CAT5 cable to the Control Box 01 02...

Страница 19: ...Order and Installation Manual Installation NinjaPods Section 3 Installation Rugged Interactive 2021 Connecting Freedom Gaming All cables will be supplied Note Number of Pods to be connected will depen...

Страница 20: ...stallation Rugged Interactive 2021 Layout Layout of the Pods is at the discretion of the installer park constructor Screens should be mounted in visible places around the arena Note Number of Pods to...

Страница 21: ...4 How to Use Rugged Interactive 2021 Section 4 How to Use 4 1 NinjaPods has two programs 1 Cascade 1 minute 2 Chaser X4 1 minute NinjaPods will feature two red pods cable two and three These will be...

Страница 22: ...y in pairs or as a team Gameplay All pods will illuminate The pods will firstly appear blue then change to green then yellow then finally red Each colour change takes 3 seconds therefore 12 seconds in...

Страница 23: ...1 red pod 1 blue pod 1 green pod and 1 yellow pod are lit at random On selection of a coloured pod it reappears elsewhere I e if the red pod is hit the red pod reappears elsewhere This would be the s...

Страница 24: ...ils Size mm Weight Size mm Weight NinjaPods Pod single unit 246 x 100 1 kg Control HUB Box 380 x 75 x 380 4 kg Scoreboard Screen 1120 x 75 x 650 10 kg Power Supply AC 110 230V 50 60Hz 13A Warranty 1 y...

Страница 25: ...NinjaPods Order and Installation Manual System Specifications NinjaPods System Specifications Rugged Interactive 2021 Mounting Points and Dimensions 50 47 94 228 228 246...

Страница 26: ...NinjaPods Order and Installation Manual System Specifications NinjaPods System Specifications Rugged Interactive 2021 NinjaPods Pod Mounting Points and Dimensions Dimensions in mm 48 3...

Страница 27: ...Features Power Supply Specification for 5 9V...

Страница 28: ...5VAC at full load 1000ms 30ms 230VAC 1500ms 30ms 115VAC at full load 3 0 1 0 3 0 1 4A 115VAC 1A 230VAC 30A 115VAC 65A 230VAC 30 60 Refer to Derating Curve 20 90 RH non condensing 40 85 10 95 RH 0 03 0...

Страница 29: ...0 90 120 110 160 140 200 180 240 220 264 LOAD 90 100 80 70 60 50 40 Mechanical Specification Case No GSM60B Unit mm 125 31 5 50 POWER LED Inside Outside ID 2 1 x OD 5 5 C 70 10mm 11 0 5mm U 2464 16AWG...

Страница 30: ...d or missing parts No trapped and or pinched cables No loose cables that could become a tripping hazard All long cables are supported at least every 50 cm Adequate strain relief provided for connectio...

Страница 31: ...on Checklist Rugged Interactive 2021 Check 4 Ready for use Play area is clear Instruction training carried out by an appropriate instructor to all new users If anything unexpected occurs or problems p...

Страница 32: ...ctions on gameplay 4 If a pod has seven 7 or fewer working LEDs we recommend replacing the pod 5 We suggest non solvent glass cleaning spray avoid spraying directly onto the pods Use a non abrasive mi...

Страница 33: ...NinjaPods Congratulations Rugged Interactive 2021 Congratulations Congratulations on your new Rugged Interactive product Your customers are going to love this and it is a great addition to your venue...

Отзывы: