Rugged Interactive
Unit 1, Callywith Court
Callywith Industrial Estate, Bodmin
Cornwall, UK
PL31 2RQ
+
44 (0) 1726 981 123
www.rugged
-
interactive.co.uk
hello@rugged
-
interactive.co.uk
NinjaPods –
Section 2 - Installation
©
Rugged Interactive
2021
3.3 - Installation Overview
Below is an overview of the steps needed to install NinjaPods. More detail for the process is
provided in the following pages. Please read through ALL of this prior to beginning the installation
and if you are in any doubt, contact Rugged Interactive.
If you have any concerns on how or what the product is installed to, contact a structural engineer
prior to beginning the installation.
STEP 1:
Assign positions for Pods, Hubs, Control Box and Screens.
STEP 2:
Install Control Box in a suitable position.
STEP 3:
Install all pods and connect via CAT5 cables to Control Box.
STEP 4:
Install display screens.
STEP 5:
Connect all cables, all elements are connected to the Control Box.
STEP 6:
Check all is secured, stress relief cables.
STEP 7:
Turn on and test.
STEP 8:
Enjoy NinjaPods!
Содержание NinjaPods
Страница 27: ...Features Power Supply Specification for 5 9V...