Rugged Interactive
Unit 1, Callywith Court
Callywith Industrial Estate,
Bodmin, Cornwall, UK
PL31 2RQ
+44 (0) 1726 981 123
www.rugged-interactive.co.uk
DodgeAttack -
System Specifications
© Rugged Interactive
20
21
DodgeAttack Installation Checklist
Please complete this checklist after any installation:
Check 1: Pre-power up checks.
Mounted into a wall or framework of a construction capable of supporting its weight and
gameplay.
☐
All fixings are tight and secure.
☐
No signs of damage, component failure and/or missing parts.
☐
No trapped and/or pinched cables.
☐
No loose cables that could become a tripping hazard.
☐
All long cables are supported at least every 50 cm.
☐
Adequate strain relief provided for connection points.
☐
Kept out of direct sunlight during the day.
☐
All electric components away from contact with water.
☐
Any protective elements for transportation removed.
☐
Check 2: Power up.
All panels light up.
☐
Text appears on the hub display and is as expected.
E.g. timers
☐
Sound volume is at a suitable level
*
.
☐
Check 3: Press the Start button.
A 3-2-1 countdown is heard, and game begins.
☐
Targets flash when ball is thrown into target.
☐
Sounds can be heard when the target is hit.
☐
Scoreboard registers hits on display.
☐
Program plays as described in the Programs Guide.
☐
Check 4: Ready for use.
Play area is clear.
☐
Содержание DodgeAttack
Страница 26: ...Features Power Supply Specification for 5 9V...