CardioWall
Outdoor Portrait
–
Section 3 - Installation
© Rugged Interactive
202
1
CardioWall Outdoor Portrait Installation
01
02
03
NOTE: Centre graphic panel and wall fixings
are all stored in the rear of the bottom
section.
The Outdoor Portrait will be delivered in two
boxes, a top and bottom section. Both boxes will
be labelled either A or B, if combat is required
across two walls, on A wall and one B wall will
need to be installed.
Drill 8 x fixing holes.
Please ensure the wall fixing holes are
drilled with the wall sections well clear of
the area to avoid dust contamination.
Two people required:
One to hold the
moulding in place and the other to clearly
mark the holes x 4. Ensure it is level.
Offer top section onto the bottom section
feeding the four cables into the top section to
avoid trapping them. Mark the top section
fixing holes.
A Plywood drilling jig may be useful for
marking all 8 fixing holes at once.