background image

6

PSA VRS/INOX M12

6  Inspection card

Product

Type

Trade name

Individual No.

 

(if available)

Manufacturer

Address

Forge code

Sequence of regular inspections

Date

Inspection

Repairing

OK

Detected fault 

Name and  

signature of 

technical 

expert

Date of 

next  

regular 

inspection

Before PSA-Fall protection anchorage points will be used, please read user instruction carefuly. 

Make sure that you understand all the substance.

Non-observance of this instruction may cause serious personal injury and/or damage to property!

The markings are according to DIN EN 365 „Personal fall protection gear“ 

– general requirements for user instructions and marking

5  Marking of the PSA-VRS and PSA INOX STAR M12

Forge code

Manufacturer

Type-denomination

Size of  

thread M12
No. of load

bearing persons 

M12: 1 Pers.

Traceability code

EN-Standard

CE- 

Marking

Notifying 

department

Hint for user´s

instruction

PSA-VRS M12

PSA INOX STAR M12

CE-Marking

Notifying department

Type- 

denomi- 

nation

No. of  

load bearing  

persons 

M12: 1 Pers.

EN-Standard

Traceability 

code

Manu- 

facturer

Hint for 

user´s

instruction

Size of  

thread M12

Содержание PSA-VRS

Страница 1: ... person for the configuration of the declaration documents Michael Betzler RUD Ketten 73432 Aalen Aalen den 20 04 2018 Hermann Kolb Bereichsleitung MA _____________________________________________ Name function and signature of the responsible person Notifying department Kennn Identification No 0299 FA PSA Test and Certification department of DGUV Test Zwengenberger Straße 68 42781 Haan Testing re...

Страница 2: ...or permanent swiveling under load because they can turn loose when turned under load Please observe the following WLL PSA VRS M12 and PSA INOX STAR M12 are per missible for max 1 Person RUD PSA lifting points fixing points are able to take all possible occurring forces in any loading directions if used in the intended way as fall arrest protection devices PSA VRS M12 is not suitable for permanent ...

Страница 3: ... admission must be used In preparation please verify a calculation to make sure that the subgrade is able to absorb the re quested forces under the given circumstances loading direction quality grade of concrete etc 2 The bolting location for the PSA Fall protection anchorage points should be marked with paint 3 The PSA Fall protection anchorage point should be installed as follows Position above ...

Страница 4: ...ll to max 6 kN Care should be taken when selecting components of equipment to avoid any risk of injury to persons or damage of property The safe function of a com ponent or a compromised equipment must not be effected Eliminate any damage of the PSA Fall protection anchorage point for example caused by loading on sharp edges The assembly of a PSA Fall protection anchorage point to a coupling eleme...

Страница 5: ... only ne cessary if noticeable abnormalities can be seen In this juncture the 10 wear reduction regulation becomes valid Cracks at load bearing parts Function and damage of bolts and threads if it s visible The product identification at the PSA Fall protection anchorage point must be high visible and easy to read Please fill out the documentation card carefully and save it to write down regular in...

Страница 6: ...ruction may cause serious personal injury and or damage to property The markings are according to DIN EN 365 Personal fall protection gear general requirements for user instructions and marking 5 Marking of the PSA VRS and PSA INOX STAR M12 Forge code Manufacturer Type denomination Size of thread M12 No of load bearing persons M12 1 Pers Traceability code EN Standard CE Marking Notifying departmen...

Отзывы: