Copyright © 2014 Ruckus Wireless, Inc.
Published January 2014, Part Number 800-70548-001 Rev C
Page 1 of 4
SC8800-S Access Point
Mounting Guide
This
Mounting Guide
provides step-by-step instructions on how to
field-install the Ruckus Wireless ZoneDirector SC8800-S access point
(AP), part number 9x1-8800-xxxx.
For detailed information on planning the installation, pointing the
internal GPS antenna, performing a site survey, preparing the
SC8800-S at the depot, and shipping to the field, refer to the
ZoneFlex
SmartCell SC8800-S Outdoor Access Point Installation Guide
. For
information on operating the SC8800-S, refer to the
ZoneFlex Outdoor
Access Point User Guide
. Both documents are available at
https://
support.ruckuswireless.com
.
WARNING:
Only trained and qualified personnel should be allowed to
install, replace, or service this equipment.
WARNING:
Installation of this equipment must comply with local and
national electrical codes.
CAUTION:
Make sure that you form a 80mm - 130mm (3”-5”) drip
loop in any cable that is attached to the AP or the building. This will
prevent water from running along the cable and entering the AP or the
building where the cable terminates.
CAUTION:
Be sure that grounding is available and that it meets local
and national electrical codes. For additional lightning protection, use
lightning rods and lightning arrestors.
CAUTION:
Make sure that proper lightning surge protection
precautions are taken according to local electrical code.
WARNING:
Ruckus Wireless strongly recommends that you wear eye
protection before mounting the SC8800-S.
T
HIS
G
UIDE
IN
O
THER
L
ANGUAGES
请从以下网站获得该指南的简体中文版
https://support.ruckuswireless.com
.
Vous trouverez la version française de ce guide à l'adresse suivante
https://support.ruckuswireless.com
.
こ の ガ イ ド の日本語版は
https://support.ruckuswireless.com
で ご覧 く だ さ い。
이
가이드의
한국어
버전은
웹
사이트
(
https://support.ruckuswireless.com
)
에서
확인하시기
바랍니다
.
Veja a versão em português (Brasil) deste guia em
https://support.ruckuswireless.com.
Puede ver la versión en español (América Latina) de esta guía en
https://support.ruckuswireless.com.
B
EFORE
Y
OU
B
EGIN
Before deploying your Ruckus Wireless SC8800-S, verify that all items
listed in
Package Contents
are included in the package. If any item is
damaged or missing, notify your authorized Ruckus Wireless sales
representative. Also, make sure that you have the required hardware
and tools.
R
EQUIRED
H
ARDWARE
AND
T
OOLS
•
Customer-supplied outdoor-rated three-wire (1-2mm
2
or 14-
18AWG) AC cable
•
Customer-supplied earth-ground wire (3-5mm
2
or 10-12 AWG)
•
1/2” (13mm) flat-blade screwdriver or equivalent
•
No. 2 Phillips screwdriver
•
Small flat-blade screwdriver
•
Torque wrench or torque screwdriver with sockets
•
Long-nose pliers
•
Electrical wire stripping and terminal crimping pliers
•
Pipe or pole --OR-- a sturdy flat surface
•
Electric drill with drill bits and customer-supplied wall anchors, flat
washers, and hex nuts for flat-surface mount
•
Two customer-supplied M16 (5/8”) carriage bolts for main
mounting bracket on a wooden pole
•
Four customer-supplied 6mm (1/4“) bolts or screws for main
mounting bracket --OR--
Four customer-supplied 14mm (1/2“) bolts or screws for main
mounting bracket --OR--
Four factory-supplied 1/2” (12.7mm) wide stainless steel adjust-
able clamps, 2.5” (63.5mm) diameter, for main mounting bracket
on smaller poles --OR--
Two 7/8” customer-supplied (22mm) wide stainless steel adjust-
able clamps for main mounting bracket on larger poles
•
Ruler
P
ACKAGE
C
ONTENTS
A complete SC8800-S field installation package includes all of the
items listed below:
•
SC8800-S Access Point (A in Figure 1), includes crimp-type earth-
ground ring terminal
•
Two M25 data cable glands (B in Figure 1)
•
One main mounting bracket (C in Figure 1)
•
One U-joint bracket (D in Figure 1)
•
Nine sets 12mm M6 x 1 hex bolt with lock and flat washers
(E in Figure 1)
•
One hook bracket (F in Figure 1)
•
One set 70mm M8x1.25 hex bolt with spring lock and flat
washers (G in Figure 1)
•
One AP attachment bracket (H in Figure 1)
•
Four SAE32 steel clamps, 2.5-inch diameter (I in Figure 1)
•
One AC power cable input end connector and cap
(J in Figure 1)
•
One safety cable (K in Figure 1)
•
This
Mounting Guide
Figure 1:
SC8800-S field-installation package contents
The field installation package can also include:
•
Service Level Agreement/Limited Warranty Statement
•
Regulatory Statement
•
Registration card
•
Declaration of Conformity, if required
NOTE:
This kit can include extra screws, nuts and washers. You may
use the extras wherever required.
S
TEP
1: C
ONNECTING
AND
S
EALING
THE
RJ-45
C
ABLES
The SC8800-S may use zero, or one or two RJ-45 cables, one for
Ethernet when configured as a Root AP (RAP), and one when the
SC8800-S is supplying PoE out to a peripheral device, such as a small
cell or micro cell radio. When the SC8800-S uses RJ-45 cables,
connect and seal the cables using the M25 data cable glands (B in
Figure 1).
1
Feed the end of the cable through the sealing nut, rubber O-ring,
clamping ring assembly and cable gland base as shown in Figure
2.
CAUTION!
THE MINIMUM SOFTWARE REVISION FOR
THE SC8800-S IS ZONEFLEX (ZF) 9.6.1 OR LATER.
DO NOT CONNECT THE SC8800-S TO A RUCKUS
WIRELESS CONTROLLER WITH ZF 9.6.0 OR
EARLIER.
F
G
H
E
A
C
B
D
I
J
K