background image

 

 

FO-HB9-2022-02 

Wiring for terminal block installation 

Connect the wiring as shown below. 

 

 

 

 

 

 

 

 

N

Ground

120V from 

breaker

L

Содержание FO-HB9

Страница 1: ... for the blower to operate OPTION 1 THREE PRONG PLUG INSTALLATION The three prong plug setup is best for new installations where the internal blower is the only option that will require electricity 1 An electrical junction box with a three prong plug outlet should be installed in the bottom of the fireplace by a certified electrician in an accessible location 2 Ensure no wires contact the firebox ...

Страница 2: ... page for the correct orientation and assembly Installation of the Internal Blower 1 Remove the bottom louver of the fireplace If your fireplace has a magnetic bracket located on the right side of the bottom louver opening remove the magnetic bracket If your fireplace is equipped with an ash pan remove the ash pan plug ash pan and the ash pan support by unscrewing the screw located at the back of ...

Страница 3: ...nting plate between the two brackets and face the air outlet upwards The thermal switch should be placed on the inside of the one for the fireplace legs 1 8 from the firebox See below Delta Fusion The floor shield is made of two parts Both parts are screwed together and factory installed to cover the entire floor below the firebox Before installing the internal blower the floor shield must be modi...

Страница 4: ...pan support the ash pan and the ash pan plug if necessary Installation of the thermal switch Install the thermal switch which is a heat activated switch that will turn your blower on and off as the fireplace heats or cools Placement is important Place the thermal switch to the inner right leg or outside air box below the firebox Space the switch 1 8 from the fireplace bottom the magnet will hold t...

Страница 5: ...FO HB9 2022 02 Wiring for terminal block installation Connect the wiring as shown below N Ground 120Vfrom breaker L ...

Отзывы: