background image

18

11

Beam n.º 5

IMPORTANT:

After placing the Skimfiltre steel panel, approximate beams n.º 5, 

as shown in the photograph

Placement of beam n.º 5

The two beams are placed on each side of skimfiltre, occupying the space of the 5th to the 7th row 

and are identified with n.º 5. Between the two beams, it is placed a steel panel for fixing the skimfiltre.

Beam n.º 5

Panel skimfiltre

Placement of Panel skimfiltre

Placement of beam n.º 5

Nº 1

Nº 2

Nº 2

Nº 4

Nº 5

BEAM N.º 5 AND PANEL SKIMFILTRE

and panel skimfiltre

Содержание NATURALIS 02

Страница 1: ...NATURALIS 02 4 34 x 5 96 m DECAGONAL ELONGATED 1 28 ASSEMBLY INSTRUCTIONS GUIDE A product of RP INDUSTRIES...

Страница 2: ...nstant Designate just one responsible for the security Get stronger the supervision when there is a lot of people inside the pool Get wet nape arms and legs before getting inside the water Learn lifes...

Страница 3: ...b The concrete slab must be made two weeks before the start of the assembly Check if The electrical connections of the equipment must be installed by a qualified technician Make sure you have enough w...

Страница 4: ...iner Filtration Widht m Widht m Weight Kg Outside Inside Depth water m DECAGONAL ELONGATED 4 34 x 5 96 m 2 m Blue Thread n 14 15 Concrete drill n 10 n 10 Necessary tools for Installation 0 10 m Excava...

Страница 5: ...layout of the pool 5 Fixing of pillars and steel base panel 6 Setting up the aluminum profile 7 Setting up Beam n 1 8 Setting up Beam n 2 9 Setting up Beam n 4 10 Setting up Beam n 3 11 Setting up Bea...

Страница 6: ...ily half buried to a depth of 42 50 cm Implantation IMPORTANT Before beginning the installation read these instructions carefully Any installation which is not made according to these instructions wil...

Страница 7: ...ete texture has to be unctuous To obtain 1 m3 of concrete you have to mix 350 kg of cement 680 kg of sand and 1175 kg of gravel 5 Excavation work ATTENTION The recommendations for partially or totally...

Страница 8: ...oncrete slab Then confirm with the corresponding diagonal measurement 5 167 m Perform marking of points 3 and 4 distanced 1 574m from points A and B respectively With these points you will obtain the...

Страница 9: ...and E F put the two basic structure panels Repeat to get the shape of the pool The plant on the next page defines the location of the respective pillars NOTE There are two types of pillars straight a...

Страница 10: ...ng to the fixing of the pillars and the base structure to the concrete slab ensure that the pillars are properly upright and the structural panels are leveled ATTENTION Before proceeding to the final...

Страница 11: ...orcements ATTENTION Should screw all pillars making sure they are leveled and upright Using the same method of fixing pillars make the fixing of panels of the base structure Position the triangular re...

Страница 12: ...vided in the kit Proceed to the set of profiles using all the holes for the purpose Repeat around the perimeter of the pool Developed to allow the fitting of the first row of platters of the wall the...

Страница 13: ...For the placing of the beams it is mandatory to respect the numbering of the parts The platters are numbered as shown in the photo IMPORTANT Prior to the laying of the first row of beams you must clea...

Страница 14: ...s check that they are correctly fitted so that it can ensure a perfect assembly of the rest of the structure During the placement of the beam ensure that this is perfectly leveled Place the first row...

Страница 15: ...n 1 Beam n 2 N 1 Base Structure Panel N 2 N 2 N 2 N 2 N 3 N 2 BEAM N 2 2nd row ATTENTION Before placing the sleepers apply a silicone cord as indicated for the first row on the top of the sleepers Th...

Страница 16: ...talled proceed to the placement of the following rows IMPORTANT You must apply among each slat a bead of silicon in the whole length in order to fix and secure a perfect stability of the whole structu...

Страница 17: ...th row IMPORTANT In each row you should be equipped with a spatula remove excess of silicon in between the beams as shown in the photograph The beam n 2 is intended to build the wall of the pool from...

Страница 18: ...and optionally the projector it should be in the 4th row The n 4 beam should be placed just below the future location of Skimfiltre BEAM N 4 OUTLET NOZZLE N 1 N 2 N 2 N 4 N 5 ATTENTION In case of inst...

Страница 19: ...er wall The beams are fitted and fixed in the same way as the previous rows IMPORTANT As in previous rows it must be applied before placing beam n 3 a bead of silicon through the whole length in order...

Страница 20: ...o beams are placed on each side of skimfiltre occupying the space of the 5th to the 7th row and are identified with n 5 Between the two beams it is placed a steel panel for fixing the skimfiltre Beam...

Страница 21: ...ion of holders NOTE There are two types of coping supports the straight and the angle The straight are placed on the length of the pool The angle is designed to be placed on the width of the pool The...

Страница 22: ...e as shown in the figures Start by applying a bead of silicon on the coping metal support on the inside edge of the pool Using a drill machine and a steel drill of 3 5mm make a hole every 20 cm then p...

Страница 23: ...panels making their sides overlap by approximately 1 5 cm Apply the self tapping screws at 3 points in the middle of the pillar as shown in the photograph and screw the panels Repeat this process for...

Страница 24: ...sive tape to hide the screw head 1 Apply aluminum tape between the steel panels and coping metal support parts 2 also on the junction of the steel panels and the base structure panels 3 Use the same p...

Страница 25: ...hment of the upper wall n 1 To fit the two parts put glue provided with SKIMFILTRE on part n 1 and part n 2 as shown in the photograph ATTENTION When applying the two parts of the Skimfiltre make sure...

Страница 26: ...d side facing the outside 1 By the external side tighten the nut 2 1 2 ATTENTION If your pool was delivered with a projector as an option proceed to install using the same method used for the placemen...

Страница 27: ...ON OF SKIMFILTER TO THE PUMP 16 Pump and Hydraulic system connection IMPORTANTE It is essential that the filtering system is in conformity to standard C 15 100 which requires that all electrical equip...

Страница 28: ...THE PUMP CONNECTION OF THE PUMP Follow the same indications as for the Skimfiltre After having made the connection of all accessories to the pump refer to professional service to make the electrical c...

Страница 29: ...17 Landfill around the pool Then perform the landfill until the steel base frame is completely covered approx 42 50 cm 42 50 cm Remblai 42 50 cm 10 cm 27...

Страница 30: ...it overlap and finish with the application of tape over the joints of the different elements Also apply the tape around the pool on the geotextile carpet and steel wall Proceed to the placement of the...

Страница 31: ...lling the liner you must put the joints of the Skimfiltre and outlet nozzle IMPORTANT An outside temperature of at least 20 degrees is necessary for the placement of the liner We recommend that you re...

Страница 32: ...ing of the pool help the liner position correctly Stop the filling has soon the water level is 30 cm from the middle of the mouth of Skimfiltre Reaching this point of water and after stopping water fi...

Страница 33: ...ns After installing the liner and filling the pool up to 30 cm from the middle of the mouth of the skimmer you should locate the previously placed joints on the outlet nozzle and Skimfiltre Then overl...

Страница 34: ...copings you need to keep verifying if they are being leveled If you wish could do the coping joints with a special silicon not supplied with the kit 32 21 Placing the coping IMPORTANT First place all...

Страница 35: ...ace indicated for such 33 22 Mounting of stainless steel ladder After fixing the indoor outdoor stainless ladder the pool is ready for the first bath ATTENTION For an above ground pool remove the outs...

Страница 36: ...The water level It is imperative to check that the aspiration openings are not clogged We advise you to stop filtering during the maintenance of the filtration system It is imperative to quickly repla...

Страница 37: ...tes and wipe with a sponge During high season you should clean the cartridge at least once a month and each time you use the vacuum cleaner By the end of the high season if you winter your pool you ma...

Страница 38: ...wer causing green water and deposits of calcareous With the analysis kit supplied you may check once a week the pH level The pH levels must be imperatively situated between 7 2 and 7 6 This is conside...

Страница 39: ...unforgettable moments in family RESTART AFTER THE WINTERIZING SPECIAL CASES 1 First make a Ph and a chlorine analysis 2 Filtration must work continuously over 24h until the water become transparent 3...

Страница 40: ...c Acts of vandalism such as voluntary cuts The cutting of metals near the swimming pool A careless control of PH and a PH level under 7 cause the appearance of wrinkles in the liner If the chlorine le...

Страница 41: ...by mishandling of the product RETURN OF MERCHANDISE DURATION OF THE WARRANTY AFTER FINDING AND VERIFICATION OF A MANUFACTURING DEFECT STORAGE PRECAUTIONS No goods return will be allowed without prior...

Страница 42: ...e de celle ci Toute infraction sera punie conform ment la loi en vigueur Este projecto propriedade da R P industries sendo expressamente pro bida a sua reprodu o total ou parcial sem autoriza o da emp...

Страница 43: ...nctions Teflon roll PVC glue 250cc Skimfiltre 12m3 h C3 1 RP INDUSTRIES adhesive tape Date Scale Decagonal elongated 4 34x5 96m 1 50 Ref Surface Perimeter 27 05 2020 2 Volume 3 Des 21 43m 16 91m 23 50...