COMPONENT ASSEMBLY INSTALLALLATION
Page 18
1) FAN LIMIT CONTROL
A) The fan limit control may be installed on either side.
B) Drill a 3/4” diameter hole approximately 2-1/2” inches
down centered on the desired side.
C) Insert the sensor of the fan limit control and attach
the control with the provided sheet metal screws.
2) FAN CONTROL CENTER
A) The fan control center should be installed on the
same side as the fan limit control.
B) If installing the furnace in parallel with the existing
furnace, then mount the fan control center on the
fi lter box (PURCHASED SEPARATELY) (see page 13).
C) Attach the 4 x 4 junction box with sheet metal screws.
D) Attach transformer/relay plate to junction box.
3) DRAFT BLOWER
A) Mount the draft blower using the gasket to the front
of the furnace with the three screws furnished.
B) Ensure that the gasket seals tightly between the
blower and the appliance fl ange.
Failure to mount fan properly will result in
the furnace overheating.
4) SPRING HANDLES (4)
A)Turn the spring handles on to the levers in a clock
wise
direction.
WARNING
4
3
2
1
OPTIONAL FILTER BOX
3
2
1