
4
PARTS NAME
OPERATION PROCESS
BEFORE PLUGGING IN THE UNIT TO A POWER SOURCE:
1
.
Let it stand upright for about 24 hours. This will reduce the possibility of malfunction in the cooling system from
possible mishandling during delivery
.
2
.
Insert water bottle vertically on the seat and push down both hot and cold water levers to ensure water is flowing
through the unit.
Note:
To use the hot water lever, first press the hot water safety push button before pushing down on lever
3.Insert the power plug to the wall socket and turn the Hot Water switch on the back of the unit to ON position first, and
then turn the Cold Water switch to ON position. DO NOT TURN ON BOTH SWITCHES AT THE TIME. Cooling and heating
indicator lights should light up.
The appliance is designed to provide hot or cold water whenever you need it. It will automatically turn on and off when
hot and cold water reaches the desired temperatures.
1
.
Water Funnel
2.Power Switch
3. Indicator Lights
4. Rating Label
5. Cold Water Tap
6. Hot Water Tap
7. Drip Tray
8.Power Cord
9. Drain Cap
Note:
The graphic is for reference only. The current device may have
differences with the graphic.