background image

&217(176&+(&./,67

 (See figure 13 for identification)

VENT BOX ASSEMBLY C/W: Burner assembly and Brass trim.

1 Simulated coal front
L & R Hand coal support shelves
2 Burner inserts
12 Large, 5 Medium and 2 Triangular Coals.
Fitting kit
Installation & Users Instructions.

,167$//,1*7+($33/,$1&(

If a fire back (chair brick) is fitted in the existing builders opening it will be necessary to remove it together with
any infill or rubble.  Any remedial work should be carried out including levelling the base beneath the fire. The
sizes required for the opening are shown in Fig 2.

',60$17/,1*7+(),5(35,2572,167$//,1*

To prevent any damage and to assist with the installation of the appliance both the burner and the trim should be
removed. The trim is removed by lifting the trim vertically observing that the lugs locate over the flanges of the
box. To remove the burner from the box unscrew the two screws at the base of the fascia panel and pull the burner
forward observing that the rear feet locate under two lugs in the base panel.

*$66833/<

BEFORE COMMENCING WORK, TURN OFF ANY APPLIANCES THAT ARE FED BY THE METER
AND ISOLATE THE SUPPLY BY TURNING OFF AT THE METER.

The gas connection to this appliance is made with 8mm O/D rigid or semi rigid tube to a pressure test elbow
situated on the left-hand side of the burner as shown in Fig 1. It advisable to provide a means of isolating the gas
supply to the appliance for servicing with either a restrictor elbow or isolation cock as shown in Fig 1. A 45mm
length of Bundy is supplied for use with a restrictor elbow or a 90 degree bend for use with an isolation cock; (the
supply tube support bracket may be removed as shown in Fig 4.  Provision is made in the rear of the box to make a
concealed connection; (additional holes may be drilled as required).  The installer is reminded of the requirements
of BS 6891 1988 dealing with enclosed pipes. The standard requires that when a gas pipe is fed through a wall, the
pipe should be enclosed in a tight sleeve to protect against failure caused by movement and shall be constructed to
prevent a passage of gas either between the pipe and sleeve or sleeve and the wall. If a gas supply is required to be
fed from either the left or right across the front of the appliance it should be routed as shown in Fig 7.  It is only the
MACH II Cast Iron Front & Fret that has provision for this requirement alternative Fronts & Frets will need
modifying to allow access for the supply tube, see Fig 5. If a JB front and fret is being used it will require two
stops to be fitted using the self-tap screws and spacers shown in Fig 7.

Page 5

Содержание Super Hot Toater

Страница 1: ...SUPER HOT TOASTER USERS Pages 2 3 INSTALLATION Pages 4 7 AND SERVICING INSTRUCTIONS THIS CAT I2H APPLIANCE IS FOR USE ON NATURAL GAS G20 AT A SUPPLY PRESSURE OF 20mbar IN GB and IE HAND THESE INSTRUCTIONS TO THE USER ...

Страница 2: ...ritish Standards Institution BS 5258 Part 12 1990 and is for use on Natural Gas only All gas appliance installations must be installed by a competent person in accordance with the current Gas Safety Installation and Use Regulations 1994 as amended or the rules in force and in accordance with the attached Installation Instructions failure to do so could lead to prosecution Areas of this appliance w...

Страница 3: ...e channel between the front and rear ports of burner Locate the fibre artificial coal front on the shelf above the fascia panel Figure 7 2 287 First Layer Position 4 large coals with their rear edge on the burner inserts Place 3 large coals at the rear of the coal support shelf and lay 2 further at the sides of the shelf These coals are placed on their edge 3 more large coals are placed on the coa...

Страница 4: ...The flue must be swept prior to installation unless new Care should be taken to prevent any damage being caused to surrounding soft furnishings or decor e g many embossed vinyl wall coverings may become discoloured if located too close to the appliance Clearances required for combustible shelves are shown on page 4 A hearth must always be provided to project forwards of the brass trim a minimum of...

Страница 5: ... rigid or semi rigid tube to a pressure test elbow situated on the left hand side of the burner as shown in Fig 1 It advisable to provide a means of isolating the gas supply to the appliance for servicing with either a restrictor elbow or isolation cock as shown in Fig 1 A 45mm length of Bundy is supplied for use with a restrictor elbow or a 90 degree bend for use with an isolation cock the supply...

Страница 6: ...ant reduction below an inlet pressure of 20mbar will indicate a restriction in the gas supply to the appliance that should be identified and corrected If there are any other appliances that are relatively high rated e g a central heating boiler fed from the same gas supply branch it is advisable to perform this observation with both appliances in operation 2 7 21 2 7 5 See figure 13 for identifica...

Страница 7: ...ault and rectify the cause The test should be repeated if an extractor fan is situated in the room or in any connecting room with all the doors in that room opened 9 Remove the Fret and push the flame adjustment lever inwards replace the Fret and check that the flame picture changes to a longer softer flame Demonstrate the lighting and extinguishing procedures to the user 9 6 7 7 The curing effect...

Страница 8: ...ont simulated coal To gain access to the components below the burner assembly it has to be removed from the Vent Box by disconnecting the gas supply at the inlet elbow and unscrewing the two screws at the base of the fascia panel Where the supply is fed from the right hand side across the front of the appliance it will be necessary to disconnect the supply from the isolation tap or restrictor elbo...

Страница 9: ...m the data badge located on the front controls panel Advantage should be taken of regular servicing and inspection for gas appliances to ensure their continued safe operation 6 257 3 576 67 Description Crosslee No GC No Piezo Igniter 40245 397 686 Control Knob 40232 Control Valve 41833 Oxy Pilot Burner Assembly 42313 170 415 Main Injector 41180 389 515 Coal Support 43010 Burner Inserts 42952 Front...

Страница 10: ......

Страница 11: ......

Страница 12: ...No Fig 6 issued with this document ...

Страница 13: ......

Страница 14: ......

Страница 15: ......

Отзывы: