background image

1. Laying the floor section

Prepare a level area for the playhouse to sit. Attach three wooden or similar bearers of size 50 x 50 x 1810mm (not supplied in kit) to each floor section. 

To "

VALIDATE

" the guarantee, this item should be

erected on 50mm x 50mm treated wooden or similar
bearers 

(These are not supplied with the kit.)

Ground contact must be avoided.

Back panel

Side panel

50mm

Panel frames
rest on floor.

Panel cladding
overhangs floor
edge.

50mm

Side panel

Back panel

2. Fixing the wall panels together

Position a back panel and a plain side panel on the floor as show. Note how the panel frames sit on the floor with the panel cladding overhanging the floor edge. Ensure
square and secure using 3 x 50mm screws through the frame of the side panel into the frame of the back panel. Position the other back panel next to the first, ensure level
and secure them together using 3 x 50mm screws through the frame of the first back panel into the frame of the second. Continue adding the rest of the panels as shown
in the diagrams.

Window

side panel

Drill pilot holes
for each screw in
this section.

Drill

Back panel

Side panel

Window

side panel

Window

front panel

Window

front panel

Use this diagram to check the

correct orientation of the corners

Important

Drill

Ensure the back
panel and apex
panel interlock
correctly.

Apex panel

Back panel

50mm

50mm

50mm

3. Apex panels and purlins

Create two apex panels by joining the left-hand apex panels with the right-hand apex panels, use 2 x 50mm screws for each pair of panels. Lift one apex assembly on top
of the back panel, make sure the bottom shiplap board of the apex panel fits correctly into the top shiplap board of the back panel. Secure by using 2 x 50mm screws, screw
up through the top frame of the back panel into the bottom frame of the apex panel. Attach the second apex assembly to the front of the building in the same way. Insert
the four roof purlins into the rebates in the apex sections. Fix in place using 1 x 50mm screw  at each end of each purlin. Screw through the purlin and into the frame of
the apex panels.  

Drill pilot holes
for each screw in
this section.

Important

Front window panel 875mm
Side window panel 880mm 

Отзывы: