background image

We constantly improve the quality of our products,
occasionally the components may differ from the
components shown and are only correct at time of
printing. We reserve the right to change the
specification of our products without prior notice.

If in doubt of any aspect regarding the assembly, use or safety of your building please contact us :

Help Line (Normal Office Hours)  01829 261121

ROWLINSON GARDEN PRODUCTS LIMITED
Green Lane 
Wardle Nr.Nantwich
Cheshire
CW5 6BN

Important information - retain for future reference

Shiplap buildings come ready stained but this is only a preparatory treatment. To 

VALIDATE

the guarantee, the building must be properly treated with a recognised

external wood preserver 

WITHIN 3 MONTHS

of assembly and 

RE-TREATED ANNUALLY  

thereafter. The building must also be erected on 50mm x 50mm

treated wooden or similar bearers (These are not supplied with the kit.) Ground contact must be avoided.

Timber Information.

As timber is a natural material, there are certain weather conditions that may affect the materials properties. In times of excessive dry spells the material may lose
some of its internal moisture causing a certain degree of shrinkage on a panel and in periods of excessive rain there will be a certain amount of swelling throughout
the wooden panels. This process can not be avoided. If you have problems with certain boards shrinking in dry spells try to decrease the amount of direct sunlight on
the building or the amount of air passing over the building. During hot spells spray water directly onto the panels with the aid of a garden hose.

2008 © Rowlinson Garden Products Ltd

25mm

View from outside of building

25mm

50mm

25mm

It will be necessary to
drill holes for the four
coach bolts using a
6mm diameter drill bit.

Drill

Secure the coach
bolts on the inside
of the door using
nuts and washers.

30mm

30mm

30mm

30mm

30mm

9. Coverstrips, bargeboards and finials

Fit a coverstrip into each corner, attach using 3 x 30mm nails per strip. The remaining three are used to cover the panel joins on each side and the back, attach using 
3 x30mm nails per strip. Attach bargeboards at the front so that the top edge is flush with the roof line and the two boards meet evenly in the middle secure using 
3 x 30mm nails per board. Attach a finial centrally over the join between the bargeboards use 2 x 30mm nails. In the same way fit two bargeboards and a finial to the back.

8. Fitting the door

Place the door into position. Fix the three T-hinges to the door with 4 x 25mm screws per hinge. Secure the hinges to the door frame using 3 x 25mm screws per hinge.
Fit the turn button to the door frame as shown using 1 x 25mm screw. Fit the padbolt to the door using 4 x 25mm screws and 2 x 50mm coach bolts, nuts and washers.
It will be necessary to drill holes for the coach bolts using a 6mm diameter drill bit. Fit the catch plate to the front panel, Ensure the bolt is able to slide into the catchplate,
attach using 2 x 25mm screws and 2 x 50mm coach bolts, nuts and washers, as shown below.

25mm

25mm

25mm

View from inside
of window

10. Fitting the windows

Fit two storm proof hinges in the rebates on the longer edge of the window as shown in the diagram using 2 x 25mm screws per hinge, stand the hinge end of the window
on the window panel, making sure it is centred at the top of the window opening. Open the hinges and secure them to the window panel frame using 5 x 25mm screws
per hinge. On the inside of the window panel fit the window stay and its two posts using 6 x 25mm screws as shown in the diagram.

Secure the hinges
to the longer edge

Отзывы: