70mm
70mm
It is recommended to drill pilot holes with
a 3mm drill bit in the braces and rafters
for all screws in this section.
3mm
Drill
5. Attaching the canopy
Before attaching the canopy very lightly lubricate each of the three tracks with spray lubricant. Wipe away any excess lubricant before proceeding to fit the canopy.
Insert the two fixed canopy tubes in the end sleeves of the canopy as shown. Fix these two canopy tubes to the metal brackets on the inside of each track section. Secure
the ends of each tube using 1 x 6mm washer and 1 x 30mm bolt .
Nut
Spring washer
Washer
Canopy wall plate
Wall
Fixing bolt
Canopy wall plate
Canopy wall plate
Square metal tube
Square metal tube
70mm
It is recommended to drill pilot
holes with a 3mm drill bit in the
rafter for the three screws.
3mm
Drill
4. Rafters and corner supports
Position the remaining six rafters on top of the track sections as shown and distributed evenly along the length of the tracks. When all rafters are in position, secure each
rafter with 3 x 70mm screws. Position the four corner braces as shown, secure each to the rafters using 2 x 70mm screws and secure to the legs using 1 x 70mm screw.
70mm
View from inside the canopy
30mm
30mm
30mm
12mm
Washer
6mm
12mm
Washer
6mm
Canopy wall plate
3. Connecting frame to the wall
When erecting the canopy frame, judgement should be used to determine the most appropriate fixing component to attach the metal plates to the exterior wall, bearing
in mind the strength and condition of the wall. If deemed appropriate, substitute the included wall fixing.
Lock into position the two square metal tubes using 4 x12mm bolts with the four metal brackets at the wall end of the canopy. At the opposite end position a Rafter on
top of the track sections up against the outside of the legs and secure in place with 3 x 70mm screws as shown. Put the canopy frame into position, ensure that feet are
flat on the floor and the tracks are level using a sprit level. Mark the wall with the position of the 4 holes of each wall plate.
For the fixings included, remove the frame work and drill 10mm diameter holes at positions marked to a depth of 50mm. Gently tap the fixing bolts into the hole. Reposition
the canopy frame on to the studs and secure using the washer, spring washer and the nut.
Washer
6mm