Rowlinson Garden Products SHPOT Скачать руководство пользователя страница 2

Drill pilot holes with a 3mm drill bit for all
screws in this section.

side wall panel

back wall  panel (570mm)

50mm

Panel frames
rest on floor.

Panel cladding
overhangs floor
edge.

2. Wall panels

Position the 570mm wide wall panel and a large wall panel on the floor as shown. Note how the panel frames sit on the floor with the panel cladding overhanging the floor
edge. Ensure square and secure using 4 x 50mm screws, screw through the frame of the small panel into the frame of the large panel. Position a 526mm wide wall panel
next to the large panel, ensure square and secure them together in the same way. Continue adding the rest of the panels as shown in the diagrams using 4 x 50mm screws
per join. Lift the apex panel on top of the back wall, make sure the bottom shiplap board of the apex panel fits correctly into the top shiplap board of the back panel. Secure
by using 4 x 50mm screws, screw up through the top frame of the back panel into the bottom frame of the apex panel.

Important note

To "

VALIDATE

" the guarantee, adequate provision must

be made to ensure ground contact is avoided and air is
able to circulate underneath the building.
Placing the building on a concrete pad or slab base is
acceptable provided that the building is not allowed to sit
in pooled water during wet conditions.
If the building is to sit on soil or grass it 

MUST

be

erected on pressure treated wooden 50mm x 50mm or
similar bearers 

(These are not supplied in the kit).

Rowlinson Garden Products recommend using pressure
treated bearers with all buildings on any type of base.

3. Secure the walls to the floor

Ensure the panels are sitting square on the floor. Secure using 19 x 63mm screws, screw through the panel frames and floor into the floor joists. 

63mm

1. Floor panels

Prepare a level area for the shed to sit. Position the three floor panels together and check that the whole floor is sitting level.

570mm

Drill pilot holes with a 3mm drill bit for all
screws in this section.

3mm

Drill

50mm

Floor

50mm

Use this diagram to check the

correct orientation of the corners

Important

Ensure the back
panel and apex
panel interlock
correctly.

Apex panel

Back panel

63mm

3mm

Drill

526mm

side wall

Back wall

Door panel

Содержание SHPOT

Страница 1: ...1910mm 4 33 Potting table 1 34 Side potting table 2 35 Potting table legs 29x35x740mm 4 36 Large window glazing 750x655mm 5 37 Small window glazing 580x255mm 5 38 Large window beading 12x30x728mm 10 39 Large window beading 12x30x657mm 10 40 Small window beading 15x15x257mm 10 41 Small window beading 15x15x555mm 10 42 Roof support rails 2 Gloves Before assembly We recommend that time is taken to re...

Страница 2: ...o VALIDATE the guarantee adequate provision must be made to ensure ground contact is avoided and air is able to circulate underneath the building Placing the building on a concrete pad or slab base is acceptable provided that the building is not allowed to sit in pooled water during wet conditions If the building is to sit on soil or grass it MUST be erected on pressure treated wooden 50mm x 50mm ...

Страница 3: ...te Add a bead of silicon down the edge of each panel before finally securing together Important note Secure panels loosely and adjust to achieve best fit Add a bead of silicon down the edge of each panel before finally securing together 4 Roof part 1 Build the two large roof sections using the four solid roof panels by joining the panel frames together ensure the frames are flush with each other a...

Страница 4: ... Position the finial centrally over the join of the two bargeboards and secure using 2 x 40mm screws 10mm Felt nail 50mm 50mm 40mm 40mm 10mm Felt nail 10mm Felt nail 10mm Felt nail Important note Have a least 25mm of felt overlapping the glazed roof panels Apex Panel 63mm Important note Attach the two roof support rails wit 2 x 50mm screws 8 Roof felt Cut the 4m felt roll into two equal parts Plac...

Страница 5: ... good bead of silicon has been applied under the flap of roof felt that overlaps the glazed panels before screwing the coverstrips down Flap of roof felt overlapping glazed panels Flap of roof felt overlapping glazed panels 25mm It is recommended to drill pilot holes with a 3mm drill bit for all screws in this section 3mm Drill 25mm Important note Add a bead of silicon sealant to the underside of ...

Страница 6: ... Garden Products recommend using pressure treated bearers with all buildings on any type of base Timber Information As timber is a natural material there are certain weather conditions that may affect the materials properties In times of excessive dry spells the material may lose some of its internal moisture causing a certain degree of shrinkage on a panel and in periods of excessive rain there w...

Отзывы: