background image

By purchasing any item sold by Rough Country, LLC, the buyer expressly warrants that he/she is in compliance with all 
applicable, State, and Local laws and regulations regarding the purchase, ownership, and use of the item.

 

 It shall be the 

buyers responsibility to comply with all Federal, State and Local laws governing the sales of any items listed, illustrated 
or sold.

 

 The buyer expressly agrees to indemnify and hold harmless Rough Country, LLC for all claims resulting directly 

or indirectly from the purchase, ownership, or use of the items.

 

 

Thank you for choosing Rough Country for all your UTV needs. 

 

5.

 

Transfer the center assembly part holes through the roof and secure in place with the 1/4"

-

20 x 3/4" bolts with a 1/4" 

washer on the top and bottom securing them with the acorn nuts. 

See Photo 8

 

6.

 

Using a knife or scissors, cut the H molding off flush with the roof edge. 

See Photo 9.

 

7.

 

Place the assembled roof on top of your UTV.

 

8.

 

Place the (4) supplied P

-

clamps on the ROPS, in the furthest most locations possible, in the corners of the roof 

where you can put a supplied bolt through with the 1” fender washers.  Mark these locations on the roof.

 

9.

 

Place the remaining (2) P

-

clamps on the ROPS, as close to the H molding where the roof halves come together and 

to the edge of the UTV.  Mark these locations on the roof.

 

10.

 

Using a 1/4” drill, drill the marked locations from steps 8 & 9.

 

11.

 

Install the supplied 1/4” x 1” bolts through the supplied 1” fender washers then through the roof and the P

-

clamp.  

Install the supplied 1/4”

-

28 nylock nuts on the bolts.  Tighten using a 7/16” socket and wrench.

 

 
 
 
 
 
 
 
 
 
 
 
 

 

 

Photo 8

 

Photo 9

 

Отзывы: