Operating Instructions
9
SG80AII Manual
www.rottlermfg.com
Core Drilling and Reaming Valve Guides:
There is two way to ream the guides on the SG machine with the Cullet holder adapter or with the .375”
core drill driver adapter is supplied to accept core drills and reamers.
Align core drill with valve guide by inserting core drill pilot in guide as head of machine is floated and
centered
Push green button to start the spindle, verify correct rotation. Operate at 240 RPM, feed with moderate
pressure until it clears the bottom of the guide.
Raise Quill to bring core drill above upper end of valve guide. Stop spindle by pushing red button. 4.
Select and install correct reamer. Repeat step 2 at 150 RPM.
Using RS500 Rottler Spindle Adapter and Collet Holder .500” (12.7mm):
Содержание SG80AII
Страница 2: ......
Страница 12: ...Introduction Safety Installation 9 SG80AII Manual www rottlermfg com Electrical Enclosure ...
Страница 15: ...Introduction Safety Installation 12 SG80AII Manual www rottlermfg com Location of the Shipping Brackets ...
Страница 49: ...Machine Parts 7 SG80AII Manual Type text www rottlermfg com Type text Base Assembly ...
Страница 52: ...Machine Parts 10 SG80AII Manual Type text www rottlermfg com Type text Spindle Assembly ...
Страница 56: ...Machine Parts 14 SG80AII Manual Type text www rottlermfg com Type text Transmission Assembly ...
Страница 59: ...Machine Parts 17 SG80AII Manual Type text www rottlermfg com Type text Head Support Assembly ...
Страница 66: ...Options 1 SG80AII Manual www rottlermfg com Options Options and Tooling are in separate manuals ...