12
3. Instruction for Use
3.1 The whole equipment should be placed on a stable and dry plane to operate.
3.2 Before operation make sure the following things:
The machine is in good conditions
The power complies with the requirements according to the butt fusion machine
Power line is not broken or worn
All instruments are normal
The blades of planning tool are sharp
All necessary parts and tools are available
3.3 Connection and preparation
3.3.1 Connect the basic frame to hydraulic unit by quick couplers.
3.3.2 Connect the heating plate to the hydraulic unit with the special cable.
Connection the cable with electrical box
Connection between the cable and heating plate
3.3.3 Install appropriate inserts to frame according to the outside diameter of pipes/fittings.
3.3.4 According to the requirements of fitting and welding process, set the temperature in
temperature controller and set time in timer. (See section 7 this manual).
Содержание ROWELD E Series
Страница 1: ...1 ...
Страница 22: ...22 7 Electrical draw diagram and Hydraulic schematic diagram 7 1 Electrical draw diagram ...
Страница 23: ...23 7 2 Hydraulic schematic diagram ...
Страница 53: ...53 7 Electrical draw diagram and Hydraulic schematic diagram 7 1 Electrical draw diagram ...
Страница 54: ...54 7 2 Hydraulic schematic diagram ...