![Roth Rotilabo II Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/roth/rotilabo-ii/rotilabo-ii_operating-manual_1491203032.webp)
1
2
5.1 Is everything in the package?
Confirm that your package includes:
Bottle-top dispenser with discharge tube, telescoping filling tube, mounting tool, bottle adapters,
a performance certificate and this operating manual
2. Mounting the instrument on a bottle and alignment
Screw the instrument (GL 45 threads) onto the reagent bottle, and
then align the discharge tube with the bottle label. This is done by
rotating the valve block with the discharge tube (Fig. 2).
To avoid tipping over, use a bottle stand for small bottles.
1. Mounting the filling tube/ recirculation tube
Adjust the length of the telescoping filling tube to the bottle height
and attach it. Center and attach the filling tube carefully to avoid
damaging the nozzle (Fig. 1).
Nominal volume, ml
Adapters for bottle thread,
PP
Filling tube
Length, mm
2, 5, 10
GL 25, GL 28/S 28, GL 32, GL 38, S 40
125-240
25, 50, 100
GL 32, GL 38, S 40
170-330
5. First Steps
5.2 Assembly
Warning!
Wear protective clothing, eye protection and gloves! Follow all
safety instructions and observe limitations of use and operating
limitations (page 28-30).
32