Roth HELIOSTAR Скачать руководство пользователя страница 2

The on-roof attachment set is capable for
installation of Roth flat collectors Heliostar®
on roofs with a slope greater than 22°. One
attachment anchor universal can be used for
roofs with covering made of pantiles/ roofing
tiles and similar roofing stones as well as plain
tiles and fibre-cement corrugated plates.
Installations on roofs made of natural slates
should be carried out by companies employ-
ing professional tilers only.  

Please read the installation instructions
before starting the installation carefully
and follow the indicated safety informa-
tion.

The valid industrial 

safety instructions

and regulations of technology especially with
regard to working on the roof have to be
observed (see page 12). In case of higher
loads of snow starting from zone 4 and in
places above 600 m NN, please contact our
technical department to discuss statics of the
installation.

Please note:

You may need additional mater-

ial such as ventilation roofing tiles for the roof
lead-through of the collector field connections
(available in special tiler stores and construc-
tion material wholesalers), possibly adjustment
lumbers for padding the rafter anchor, sheet
metal for sealing the rafter anchor when
using plain tiles. To carry the collector on the
roof additional equipment could be required.

Important:

When storing the collectors

before installation, make sure the collectors
do not stand outside, lay on the glass and/or
are stocked uncovered, to avoid humidity
entering into the collector through the wholes
in the collector frame. Before installing the
collector connections, they must be annealed.
Therefore, always push strongly against the
1/2” thread connection when tightening.
Non-compliance can result in damage of the
collector.

The metal pipelines of the solar circuit must
be connected through a green/yellow conduc-
tor of min. 16 mm

2

Cu (H07 V respectively R)

with the main potential adjustment rail. If a
lightning protection installation is available,
the collectors can be linked to it. Earthing can

also be done by a depth earth electrode. The
grounding cable must be placed outside on
the house. In addition the earth electrode
must be connected with the main potential
adjustment rail with a cable of the same
diameter.

Installation requirements

Safety information

Generel requirements

Potential adjustment 
and lightning 
protection

2

•  Spanner 13/17/19/20/22
•  Boring machine, 
•  Cross slot PZ 3
•  Angle grinder with stone shim
•  Hammer
•  String (approx. 10 m), measuring tape, rope
•  Pencil

Overview of tools

The sensor must be installed in the last flood-
ed collector on the supply side (hot outlet).
For this purpose, the rubber sleeve must be
removed, the sensor must be threaded and
the rock wool inside of the collector should be
pushed aside. Afterwards place some heat
conducting paste on top of the sensor and
insert it as far as possible into the immersion
sleeve. In the end push the rubber sleeve back
into its position until the countering lip inter-

locks with the collector frame. To extend the
cable of the sensor up to 50 m it is sufficient
to choose a cable diameter of 2 x 0,75 mm,
for more than 50 m a diameter of 2 x 1,5 mm
must be used. To protect the connected regu-
lation units against overvoltage the collector
sensor is to be extended appropriately, directly
behind the collector, through an overvoltage
protection case (optional).

Installation of sensor

Содержание HELIOSTAR

Страница 1: ...ENERGY AND SANITARY SYSTEMS ON ROOF ATTACHMENT FLAT COLLECTOR HELIOSTAR INSTALLATION INSTRUCTIONS ...

Страница 2: ... must be annealed Therefore always push strongly against the 1 2 thread connection when tightening Non compliance can result in damage of the collector The metal pipelines of the solar circuit must be connected through a green yellow conduc tor of min 16 mm2 Cu H07 V respectively R with the main potential adjustment rail If a lightning protection installation is available the collectors can be lin...

Страница 3: ...0 m 2 40 m 1 1 2 m 4 80 m 0 8 m 1 1 2 m 1 1 2 m 1 1 2 m 6 00 m 0 8 m 1 1 2 m 1 1 2 m 1 1 2 m 1 1 2 m 0 8 m 1 1 2 m 1 1 2 m 1 82 m 1 82 m 1 82 m 1 82 m 1 82 m 1 36 m 1 36 m 1 36 m 1 36 m 1 36 m 3 60 m 1 16 m 1 0 1 2 m 0 8 1 0 m 2 40 m 1 0 1 2 m 1 0 1 2 m 6 m 4 80 m 3 60 m 1 36 m 1 36 m 1 36 m 1 36 m 1 36 m 0 8 1 0 m 0 8 1 0 m ...

Страница 4: ... m 2 40 m 1 1 2 m 4 80 m 0 8 m 1 1 2 m 1 1 2 m 1 1 2 m 6 00 m 0 8 m 1 1 2 m 1 1 2 m 1 1 2 m 1 1 2 m 0 8 m 1 1 2 m 1 1 2 m 2 10 m 2 10 m 2 10 m 2 10 m 2 10 m 1 64 m 1 64 m 1 64 m 1 64 m 1 64 m 3 60 m 1 20 m 2 40 m 6 00 m 4 80 m 3 60 m 1 64 m 1 64 m 1 64 m 1 64 m 1 64 m 0 8 1 0 m 1 0 1 2 m 0 8 1 0 m 1 0 1 2 m 1 0 1 2 m 0 8 1 0 m ...

Страница 5: ...nal screws made of stainless steel M 10 x 30 U profile discs with washer and nut 6 2 Stainless steel corrugated hose with union nut 1 2 insulation 20 x 13 mm and sealing ring L 300 mm 1 1 Stainless steel corrugated hose with insulation 20 x 13 and sealing rings length 900 mm 2 Roth attachment anchor universal vertical incl attachment screws 6 2 Material System components 1 2 3 4 5 6 7 1 5 4 8 Exte...

Страница 6: ... made of stainless steel M 10 x 30 U profile discs with washer and nut 6 2 Installation rail extension made of aluminium length 900 mm 2 Stainless steel corrugated hose with union nut 1 2 insulation 20 x 13 mm and sealing ring L 300 mm 1 1 Stainless steel corrugated hose with insulation 20 x 13 and sealing rings length 900 mm 2 Roth attachment anchor universal horizontal incl attachment screws 6 2...

Страница 7: ...epends on the quantity of attachment anchor universal and the col lector field height Measure c 0 74 m both versions Measure valid for 1 collector field only 2 Removal of roofing tiles to install the attachment anchor universal per attach ment anchor universal 2 3 roofing tiles 3 Attachment anchor universal 4 For your safety When working in danger of falling off the roof be sure to wear protective...

Страница 8: ... attachment anchor universal must be inserted before joining the individual pro file segments For this purpose measure the position of the attachment anchor uni versal and mark on the profile rails At this spot insert 1 screw with U profile disc each 3 4 Afterwards insert connection of both profile rails on the side 5 When connecting both profile rails push the attachment clamps in the designated ...

Страница 9: ...0 7 8 9 Only applies for horizontal installa tion For better resistance install a securing detail B page 6 above the 2 lowest attachment anchors universal 10 11 Profile rails with hexagonal screws M 10 x 30 and U profile washers are tightened through the long holes of the attachment anchor universal 6 11 7 9 8 ...

Страница 10: ...lector for vertical and horizontal installation to apply collector to profile rails 14 Place collector on profile rails and slide it into attachment clamps from the side 15 16 Fix both outer attachment clamps with U profile and hexagonal screw M 10 x 25 mm Before installing the second and any additional collector remove the protection film on the sides where the collectors touch 17 For installing ...

Страница 11: ... plaids 19 When tightening the screw connections make sure to push against the collector Non compliance can damage the collector 20 Prepare ventilation block cut fence and if necessary separate available sarking membrane and fix in raised position respectively use sealing member special wholesaler Observe rising corrugated hose positioning 21 ...

Страница 12: ...ure in an angle of 65 75 Exit must be topped by a minimum of 1 m Security of not falling of the roof In case of falling height 3m on roofs with a slope between 20 and 60 it is required to provide corresponding security for falling protection VBG 37 8 The vertical distance from the working place to the roof scaffold or alternatively the roof protection wall should not exceed 5 m For protection it i...

Отзывы: