background image

 

 

Operating instruction bladder accumulator BLAK - English

 

13

 

Disturbance, causes, troubleshooting (qualified staff only) 

Disturbance 

Cause  

Troubleshooting 

Pressure equipment will 
not supply hydraulic fluid

 

 

Oil valve closed  

 

Gas-side pressure too low  

 

Pressure relief open 

 

Open oil valve   

 

Check pre-inflation pressure  

 

Close pressure relief  

Hydraulics pressure too 
low

 

 

Shut-off valve closed  

 

Pump does not pump  

 

Open shut-off valve  

 

Check the pump functionality and 
repair as necessary  

N2 safety valve opens

 

 

Gas-side pressure too high  

 

Operation markedly increases the gas 
temperature  

 

Fluid overflow  

 

Check the pre-inflation pressure and 
settings of the plant  

 

Find reasons for the temperature 
rise  

 

Depressurise the pressure 
equipment   

Gas valve leaking

 

 

The inflating pressure will drop if the gas valve leaks. Permitted pressure ratio 
exceeded. The bladder may potentially be destroyed

 

 

Gas valve and/or valve cap damaged 

 

 

Replace gas valve and/or valve cap, 
use original parts 

 

Oil valve leaking

 

 

O-ring damaged or hardened due to 
excessively high oil temperature  

 

Replace O-ring, using original parts, 
check oil temperature if necessary 
and take appropriate action  

Bladder leaking

 

 

Diagnosing causes – see below  

 

Replacing bladder and other 
measures – see below  

Premature failure (0 - 
20 000 load cycles)

 

 

Foreign inclusions in rubber. 
Manufacturing or material defect. Poor 
vulcanisation  

 

Check gas valve  

Bladder is brittle, rigid, 
porous and carbonised.

 

 

Operating ratio greater than 1:4, thus 
compression temperature too high; N2 
heating up excessively. Oil temperature 
too high  

 

Calculate new inflation pressure and 
set; set oil temperature to 
permissible value  

Bladder is porous and 
swollen

 

 

Unsuitable fluid, e.g. fire-inhibiting liquids 
and buna bladder  

 

Check fluid, consult manufacturer  

Bladder carbonised on the 
gas valve side

 

 

Inflow speed and operating pressure ratio 
too high, due to pressure peaks in system 
or too low inflation pressure. Heat 
accumulation on gas valve side 
inadequately dissipated  

 

Reduce inflow speed using flap or 
increase inflation pressure  

Bladder has abrading 
areas  

 

 

Inflation pressure too low. Particularly with 
synthetic heavy fluids, the bladder may 
rub on, due to greater buoyancy  

 

Check inflation pressure. Vertical 
installation is recommended from 10 
litre and up pressure equipment.  

Bladder base has a tear, 
hole etc. 

 

 

Faulty oil valve  

 

Replace oil valve and bladder  

Distinct oil valve imprint on 
bladder base. 

 

 

Inflation pressure too high. Bladder base 
hammers against fluid valve. Discharge 
speed too high.  

 

Reset pre-inflation pressure  

Bladder is creased 

 

 

30 and 50 litre pressure equipment 
assembly fault  

Valve disc of oil valve 
jamming, potentially 
damaging the bladder 

 

 

Using fluids leading to sticking / gumming  

 

Regular functional test for mobility 
of valve disc  

Содержание BA-BLAK-CE-EN

Страница 1: ...OPERATING INSTRUCTION BLADDER ACCUMULATOR Type BA BLAK CE EN Language English Edition 09 2016 Revision 01 Translated from German original ...

Страница 2: ...ulator Roth pressure equipment Translation If sold to a country in the EEA this operating instruction must be translated into the language of the country in which the machine is to be used Should the translated text contain incongruities the original operating manual German must be consulted or the manufacturer contacted for clarification Copyright No part of this publication may be reproduced tra...

Страница 3: ...__________________________________________________ 7 4 Dangers ____________________________________________________________________ 9 4 1 General hazard notes__________________________________________________________ 9 4 2 Installation of spare and wearing parts ____________________________________________ 9 4 3 Cleaning maintenance and repair work ___________________________________________ 9 5 I...

Страница 4: ...ated application 1 1 Overview of standard Roth pressure equipment The pressure equipment essentially consist of the following components 1 Accumulator shell 2 Gas bladder 3 Valve on gas side 4 Valve on oil side Figure 1 1 Overview of standard Roth pressure equipment ...

Страница 5: ...with different operating parameters it is possible that the test intervals for periodic tests will become shorter Please consult the manufacturer in such cases Intended use also includes compliance with the manufacturer s operating maintenance and servicing instructions Furthermore the operator is obliged to adhere to the legal state regulations according pressure equipments in connection with the...

Страница 6: ...ressed gas 2 2 Filling and testing the pressure equipment During or after filling with N2 use foaming agents to test all screwed connections shut off valves connections and joints for gas tight sealing In principle use Roth filling and testing device and observe the relevant operating instruction The pre inflation pressure P0 depends on the ambient temperature isochore behavior of N2 see Chapter 2...

Страница 7: ...ferent at the time of filling or checking P0 the diagram may be used to find the pressure corresponding to that temperature when filling or checking Example Assume a gas system at 155 bar of pressure at a gas temperature of 20 C If the gas temperature rises to 35 C the intersection 155 bar at 20 C will shift to the next pressure temperature curve to intersect the vertical 35 C temperature line The...

Страница 8: ...pressure equipment after final assembly final coating 3 2 Identification Nameplate The pressure equipment has a nameplate and acceptance certificate attached These show essential technical data Changing data and markings without prior written approval of the manufacturer is strictly prohibited The pressure tank nameplate will always be binding should there be discrepancies between data for differe...

Страница 9: ...ational implementations of framework Directive 89 391 EEC as amended and the associated individual directives including specifically Directive 2009 104 EC as amended on the minimum requirements for safety and health of employees working with work materials must be observed and complied within the EEA European Economic Area The BetrSichV Operational Safety Ordinance transposes Directives 89 391 EEC...

Страница 10: ...orking material protective equipment and maintenance product disposal waste disposal laws material disposal waste disposal laws cleaning cleaning agents and disposal and environmental protection will be complied with Local regulations must be observed during installation and commissioning carried out by the operator itself e g acceptance testing etc ...

Страница 11: ...ing parts The manufacturer s guarantees will lapse should parts that have not been tested or approved by the manufacturer be installed Pressure retaining components must only be replaced by or with the approval of the manufacturer Renewed acceptance testing by a notified body will be required The N2 concentration in the environment may increase when N2 is filled or drained Adequate ventilation mus...

Страница 12: ...ortation see Fig 1 1 Pos 1 Consult the drawing for the weight of the pressure equipment or its components Take note of the centre of gravity 5 3 Storage Intermediate storage packaged The pressure equipment and the spare and replacement parts are delivered to allow for storage up to 3 months Storage conditions Closed and dry room according to the designated operating conditions Storage packaging fo...

Страница 13: ...s may occur at the limits of operating conditions The operator should provide suitable protection Consult Chapter 6 for service notes and test schedules Use the fastening hardware provided by the manufacturer to ensure that all parts will be securely fastened Before assembly Check the delivery for transport damage to ensure that it is technically intact Instruct the qualified staff Prior to commis...

Страница 14: ... to check all screwed connections shut off valves connections and joints for gas leakages Check the N2 pre inflation pressure P0 Regularly check the internal coating for wear when using abrasive or corroding fluids 6 2 Initial operating repeated inspection and periods of repeated inspection Initial operating In Germany the pressure equipment is subject to the Operational Safety Ordinance 15 will a...

Страница 15: ...les Foreign inclusions in rubber Manufacturing or material defect Poor vulcanisation Check gas valve Bladder is brittle rigid porous and carbonised Operating ratio greater than 1 4 thus compression temperature too high N2 heating up excessively Oil temperature too high Calculate new inflation pressure and set set oil temperature to permissible value Bladder is porous and swollen Unsuitable fluid e...

Страница 16: ...mergency Off systems or fast pressure relief action should therefore preferably be defined and documented in the work instructions of the operator 9 Dissembling disposal Ensure that the pressure equipment is depressurised on the gas and oil sides before disposal Sort the pressure equipment by materials to be disposed in accordance with applicable local environmental regulations Decontaminate and d...

Страница 17: ...Operating instruction bladder accumulator BLAK English 15 Notes ...

Страница 18: ...16 Operating instruction bladder accumulator BLAK English Notes ...

Страница 19: ......

Страница 20: ...Operating instruction bladder accumulator BLAK English Technical changes reserved ...

Отзывы: