44
During initial start-up and when water temperature is low, it is important that the water is heated gradually. Failure to do so may
result in concrete floors cracking due to rapid temperature change. Please contact the responsible cast concrete building
contractor for further details.
To do so, the lowest water flow set temperature can be decreased to a value between 25°C and 35°C by adjusting the FOR
SERVICEMAN. Refer to
SPECIAL FUNCTION
.
Checks before initial start-up.
9.3 Initial start-up at low outdoor ambient temperature
9.4 Pre-operation checks
DANGER
Switch off the power supply before making any connections.
After the installation of the unit, check the following before switching on the circuit breaker:
Field wiring
:
Make sure that the field wiring between the local supply panel and unit and valves (when applicable),
unit and room thermostat (when applicable), unit and domestic hot water tank, and unit and backup heater kit have
been connected according to the instructions described in the chapter 8.8 "Field wiring", according to the wiring
diagrams and to local laws and regulations.
Fuses, circuit breakers, or protection devices Check that the fuses or the locally installed protection devices are of
the size and type specified in 13 "Technical specifications". Make sure that no fuses or protection devices have
been bypassed.
Backup heater circuit breaker
:
Do not forget to turn on the backup heater circuit breaker in the switchbox (it
depends on the backup heater type). Refer to the wiring diagram.
Booster heater circuit breaker
:
Do not forget to turn on the booster heater circuit breaker (applies only to units with
optional domestic hot water tank installed).
Ground wiring
:
Make sure that the ground wires have been connected properly and that the ground terminals are
tightened.
Internal wiring
:
Visually check the switch box for loose connections or damaged electrical components.
Mounting
:
Check that the unit is properly mounted, to avoid abnormal noises and vibrations when starting up the unit.
Damaged equipment
:
Check the inside of the unit for damaged components or squeezed pipes.
Refrigerant leak
:
Check the inside of the unit for refrigerant leakage. If there is a refrigerant leak, call your local dealer.
Power supply voltage
:
Check the power supply voltage on the local supply panel. The voltage must correspond to the voltage
on the identification label of the unit.
Air purge valve
:
Make sure the air purge valve is open (at least 2 turns).
Shut-off valves
:
Make sure that the shut-off valves are fully open.
ON=1
OFF=0
1/2
2
DIP
switch
0/0=Without IBH and AHS
1/0=With IBH
0/1=With AHS for heat mode
1/1=With AHS for heat mode
and DHW mode
3/4
1
3/4
ON=1
OFF=0
DIP
switch
S1
S2
Factory
defaluts
OFF/OFF
OFF/OFF
Start pumpo after
six hours will
be invalid
Factory
defaluts
without TBH
with TBH
Start pumpo after
six hours will
be valid
0/0=
variable speed pump,Max head:
8.5m(
GRUNDFOS
)
0/1=
constant speed pump(
WILO
)
1/0=
variable speed pump,Max head:
10.5m(
GRUNDFOS
)
1/1=
variable speed pump,Max head:
9.0m(
WILO
)
OFF
OFF
ON/ON
DIP
switch
S4
1
2
3/4
Factory
defaluts
ON=1
OFF=0
Reserved Reserved
Reserved Reserved
Reserved
OFF
OFF
OFF/OFF
0/0=3kW IBH(One-stage control)
0/1=6kW IBH(Two-stage control)
1/1=9kW IBH(Three-stage
control)