Effectivity: 912 Series
Edition 1 / Rev. 1
d04639
page 99
May 01/2009
BRP-Powertrain
INSTALLATION MANUAL
16) Air intake system
See Fig. 64.
The intake system is determined essentially by the demands of engine and of the
acceptable noise emission on the intake side. An airbox can be supplied by BRP-
Powertrain as an option.
Performance data as specified and limits of operation can only be warranted by
employment of the genuine ROTAX airbox.
■
CAUTION:
The performance is given at ISA (15 °C) (59 F°) condition only. Engine
is equipped with unchanged ROTAX tuned exhaust muffler system
and air intake box.
If it will be necessary to use a different airbox or a modified genuine ROTAX airbox for
reasons of installation the certification to the latest requirements such as FAR and
EASA has to be conducted by the aircraft manufacturer.
◆
NOTE:
If an airbox or genuine ROTAX airbox is retrofitted at a ROTAX 912 (A,
F, UL) Series, a change in the carb jetting is required. See Illustrated
Parts Catalog 912/914 chapter 22 and/or SB-912-044 "Use of the
ROTAX supplied airbox", latest issue.
16.1) Operating limits
Fuel-mixture distribution:
Low (cold) air temperature in the airbox is favourable for engine performance
and to reduce knocking tendency at combustion.
The certification to the latest requirements such as FAR and EASA has to be
conducted by the aircraft manufacturer.
■
CAUTION:
Any changes on the air intake system (e.g. modification on the
airbox etc.) can affect the flow rate in the air intake system and
the fuel mixture ratio. In the course of certification the fuel
mixture process must be proofed by a CO-measurement.
CO-Measurement:
CO-Emission ......................... min. 3,0 % CO (wide open throttle (WOT);
an rpm of min. 5200 1/min needs to be achieved)
Measurement in original configuration of aircraft e.g. with installed cowling.
Measured on each single cylinder. Measuring point is the same as the EGT-
measurement. See section "Exhaust system".
Содержание 912 ULS 3
Страница 1: ...45 5 0 6 03 305 9 5 1 4 3 4 QBSU OP 898642 305 9 6 4 8 5 015 0 4 2 2 4 3 Ref No IM 912...
Страница 6: ...page 6 May 01 2007 Effectivity 912 Series Edition 1 Rev 0 d04050 INSTALLATIONMANUAL BRP Rotax NOTES...
Страница 10: ...page 10 May 01 2007 Effectivity 912 Series Edition 1 Rev 0 d04051 INSTALLATION MANUAL BRP Rotax NOTES...
Страница 16: ...page 16 May 01 2007 Effectivity 912 Series Edition 1 Rev 0 d04051 INSTALLATION MANUAL BRP Rotax NOTES...
Страница 18: ...page 18 May 01 2007 Effectivity 912 Series Edition 1 Rev 0 d04051 INSTALLATION MANUAL BRP Rotax NOTES...
Страница 20: ...page 20 May 01 2007 Effectivity 912 Series Edition 1 Rev 0 d04051 INSTALLATION MANUAL BRP Rotax NOTES...
Страница 26: ...page 26 May 01 2007 Effectivity 912 Series Edition 1 Rev 0 d04052 INSTALLATIONMANUAL BRP Rotax NOTES...
Страница 30: ...page 30 May 01 2007 Effectivity 912 Series Edition 1 Rev 0 d04052 INSTALLATIONMANUAL BRP Rotax NOTES...
Страница 46: ...page 46 May 01 2007 Effectivity 912 Series Edition 1 Rev 0 d04053 INSTALLATION MANUAL BRP Rotax NOTES...
Страница 90: ...page 90 May 01 2007 Effectivity 912 Series Edition 1 Rev 0 d04056 INSTALLATION MANUAL BRP Rotax NOTES...
Страница 98: ...page 98 May 01 2007 Effectivity 912 Series Edition 1 Rev 0 d04057 INSTALLATION MANUAL BRP Rotax NOTES...
Страница 120: ...page 120 May 01 2007 Effectivity 912 Series Edition 1 Rev 0 d04059 INSTALLATION MANUAL BRP Rotax NOTES...
Страница 124: ...page 124 May 01 2007 Effectivity 912 Series Edition 1 Rev 0 d04060 INSTALLATION MANUAL BRP Rotax Fig 82 08328...
Страница 134: ...page 134 May 01 2007 Effectivity 912 Series Edition 1 Rev 0 d04060 INSTALLATION MANUAL BRP Rotax NOTES...
Страница 135: ......