background image

 

22 

 

FIG. 1 BASE

 

Nr. 

CODE 

DESCRIPTION 

QUANTITY

 

01-2224 

P1-P2 BASE  

01-2252 

CLAMP 

03-3082 

M8X24 TE SCREW 

01L2266Z 

CLAMP (ONLY ON FLOOR9 

01L2265Z 

CLAMP (ONLY ON FLOOR) 

01L2264G 

FOOTGUARD (ONLY ON FLOOR) 

 

FIG. 2 ARMS

 

01-2263 

LOWER INSIDE BOOM 

01-2267 

LOWER OUTSIDE BOOM 

01-2271 

LEFT UPPER OUTSIDE BOOM 

01-2270 

RIGHT UPPER OUTSIDE BOOM  

01-2268 

RIGHT UPPER INSIDE BOOM 

01-2269 

LEFT UPPER INSIDE BOOM 

01-2214 

BASE FASTENING PIN 

03-3527 

 25 mm SNAP RING FOR SHAFTS 

12 

03-3524 

25x28x15 SELF LUBRICATING BUSHING 

24 

10 

02-2204 

ROLLER 

11 

03-3075 

 30x34x25 SELF LUBRICATING BUSHING 

12 

02-2215 

PLATFORM FASTENING PIN 

13 

02-2212 

BOOM COUPLING PIN 

14 

03-3072 

25x28x40 SELF LUBRICATING BUSHING 

15 

03-3526 

SELF LOCKING-NUT 

16 

16 

03-3070 

ANTIFRICTION WASHER 

16 

17 

02-2229 

LOWER BOOM COUPLING PIN 

18 

03-3525 

25x28x30 SELF LUBRICATIN BUSHING 

24 

19 

02-2209 

BOOM FASTENING PIN 

20 

01-2214 

SLEIGHT 

22 

01-2215 

 NYLON SKATE 

23 

02-2224 

HOSE SUPPORT 

 

FIG. 3 LEVERS AND PISTONS

 

02-2202 

DISTANCE PIECE 

04-4100 

P1 PISTON  

04-4101 

P2 PISTON  

01-2210 

LEVER BOOMS 

01-2209 

LEVER 

02-2206 

LEVER ROLLER 

02-2230 

PISTON ROLLER 

02-2213 

PISTON FASTENING PIN  

10 

02-2208 

ROLLER FASTENING PIN 

11 

03-3527 

 25 mm SNAP RING FOR SHAFTS 

12 

03-3524 

 25x28x15 SELF LUBRICATIN BUSHING 

13 

02-2207 

PIN 

15 

03-3074 

 30x34x15 SELF LUBRICATING BUSHING 

16 

02-2216 

PISTO FASTENING PIN 

17 

02-2205 

SHORT DISTANCE PIECE 

18 

02-2218 

LONG DISTANCE PIECE 

20 

01-2259 

CLAMP 

25 

01-2261 

MECHANICAL SAFETY P2 

21 

01-2258 

MECHANICAL SAFETY P1 

22 

01-2262 

DISENGAGE FOR MECHANICAL SAFETY CLAMP 

23 

02-2233 

AIR PISTON 

 

FIG. 4 PLATFORM 

 

01-2239 

 PLATFORM  

2

/4

 

01-

2242/

2254

 

EXTENSION right/

left

 

1-

1

 

02-2219 

EXTENSION PIN 

 
 
 
 

Содержание GLP99SM

Страница 1: ...SCISSOR LIFT FREE WHEELS GEMINI LOW PROFILE OPERATING INSTRUCTIONS GLP99SM GLP99SM P...

Страница 2: ...WITH THE FOLLOWING EUROPEAN DIRECTIVES 98 37 CEE 73 23CEE 93 68 CEE 89 336 IT ALSO DECLARES THAT THE FOLLOWING EUROPEAN RULES HAVE BEEN RESPECTED EN 292 1 EN 292 2 EN294 EN 349 EN 1050 EN 60204 1 ETS...

Страница 3: ...N 291 1992 EN 292 1992 EN 294 EN349 EN1050 EN 60204 1 EN 300683 EN 55022B Only skilled and previously authorized technicians should be allowed to carry out transport assembling setting maintenance ove...

Страница 4: ...sed versions They have been designed and built for car van lifting and placing operations Our car lifts are equipped as follows A BASE Fixed structure B BOOMS PLATFORM Lifting and travelling structure...

Страница 5: ...be padlocked to prevent the use of the lift during the maintenance 1 position the lift is powered GLP99SM GLP99SMP double scissor car lifts are able to lift vehicles and van whose weight is no more t...

Страница 6: ...he lift 4 Never use the lift without protection or when safety devices are off line 5 Always use the rubber pads when lifting a vehicle observing the proper points of support specified by the vehicle...

Страница 7: ...LD BE ALLOWED TO INSTALL THE CAR LIFT SERIOUS DAMAGE TO PEOPLE OR EQUIPMENT CAN BE CAUSED IF THIS RULE IS NOT FOLLOWED The lift must be installed according to the specified safe distance from walls co...

Страница 8: ...ctric card of the power unit WIRING CONNECTIONS POSITION N CODE DESCRIPTION 1 06 0302 Lifting limit switch 4 06 6607 Photoelectric cell 3 06 0302 P2 platform self levelling 5 06 0302 P1 platform self...

Страница 9: ...9 WIRING DIAGRAMS...

Страница 10: ...10 WIRING DIAGRAM...

Страница 11: ...11 WIRING DIAGRAM...

Страница 12: ...ORS K1 17 RELAIS D1 37 DIODS R1 44 RESISTORS DL LED SPRI BLEEPER S1 RESET TIMER BUTTON S2 TIMER REGULATOR IC4 TIMER MICROCHIP ICS BLEEPER MICROCHIP C1 24 CAPACITOR TR1 5 TRANSISTORS IC 1 2 3 5 VOLTAGE...

Страница 13: ...4 3001 LEVELLING P2 DELIVERY C 04 3004 PIPE CONNECTION H P1 HYDRAULIC PLAN 1 PARACHUTE VALVE 6 3 5 L PUMP 2 LEVELLING ELECTRO VALVE EL 7 THREE PHASE MOTOR 4 HP 3 LOWERING ELECTRO VALVE EO 8 SUCTION FI...

Страница 14: ...n power supply is disconnected to avoid the possibility of electrocution COMMERCIAL PARTS WIRING PLANT Position n Denomination Manufacturer Type Max Appl Proximity SIEMENS 10 30V DC pnp NC 0 3A Sn1 2m...

Страница 15: ...tform so that they are in line with the lifting points specified by the manufacturer Press the lifting button keep it pressed until the required height is reached To lower the lift press the lowering...

Страница 16: ...al capacity cannot be lifted Max pressure valve malfunction Suction filter malfunction Worn pump Contact service dept Clean the suction filter or contact service dept Replace the pump Platform out of...

Страница 17: ...icated on chapter 3 and 6 when making the substitution of the spare parts and the repair intervals Spare parts ordering procedure When ordering spare parts the following must be clearly specified Car...

Страница 18: ...18...

Страница 19: ...19 FIG 3 LEVERS AND PISTON FIG 4 PLATFORM...

Страница 20: ...20 FIG 5 CONTROL BOX...

Страница 21: ...21 FIG 6 ELECTRIC COMPONENTS FIG 7 SAFETY ELEMENTS FIG 8 RAMPS...

Страница 22: ...RICTION WASHER 16 17 02 2229 LOWER BOOM COUPLING PIN 4 18 03 3525 25x28x30 SELF LUBRICATIN BUSHING 24 19 02 2209 BOOM FASTENING PIN 8 20 01 2214 SLEIGHT 4 22 01 2215 NYLON SKATE 4 23 02 2224 HOSE SUPP...

Страница 23: ...X16 TCEI BOLT 3 33 04 4598 ACCOUPLEMENT JOINT 1 34 05 5000 AIR ELECTROVALVE 1 35 05 4040 AIR FILTER 1 36 05 5512 90 1 8 x 6 UNION ELBOW 2 37 05 5514 AIR ELECTROVALVE CONNECTOR 1 FIG 6 ELECTRIC COMPONE...

Страница 24: ...om walls columns ceiling other machines etc 3 Power supply line check 4 Lift levelling check 5 Lift working check 6 Hydraulic safeties working check 7 Electric safeties working check 8 Loaded lift che...

Страница 25: ...t of visit Positive Negative Installer Stamp and signature User Stamp and signature Date Next test on RECURRING OR OCCASIONAL VISIT N DESCRIPTION OF TEST YES NO Notes 1 Lift maintenance and cleaning c...

Страница 26: ...tic failure check 4 Safety devices working check MONTLY TESTS 1 Lift through cleaning 2 Rollers slides check 3 Cylinders air bleeding if necessary HALF YEARLY TESTS 1 Oil level check 2 High pressure f...

Страница 27: ...Stamp and signature REPAIR FAILURE ACTION Date Stamp and signature October 2000 BY THE GRAPHIC DEPARTEMENT A R ROTARY LIFT EUROPE S r l Via Tiburtina Km209 800 65025 Manoppello Scalo PESCARA ITALY Te...

Отзывы: