Lift does not operated 

Failure in the electric system 

Check 

the 

connections 

and 

electric 

components for proper conditions. 

Lowering operation cannot be performed 

Damaged lowering solenoid valve 

Check the failure of the electrovalve 

Lowering is too slow 

Flow  regulator  valve  for  lowering  control 
does not work properly 

Contact service dept. 

Motor  rotates,  but  lifting  operation  cannot 
performed.  

Lowering  solenoid  valve  locked  in  opening 
position. 
No oil in the tank 
Motor rotates the wrong way 

Contact service dept. 
 
Refill with oil to the specified level 
Check motor for proper direction of rotation. 
Exchange the phases if necessary  

Motor  rotates,  but  lifting  speed  is  extremly 
slow. 

Lowering  solenoid  valve  locked  in  opening 
position 
Worn pump 

Contact service dept. 
 
Replace the pump 

Normal capacity cannot be lifted 
 

Max pressure valve malfunction 
Suction filter malfunction  
 
Worn pump 

Contact service dept. 
Clean  the  suction  filter  or  contact  service 
dept. 
Replace the pump 

Platform out of synchronization 

Leackage in the hydraulic system 
 
 
 
Levelling electrovalve malfunction 

Repair the leackage in the hydraulic system 
and 

perform 

all 

operation 

of 

synchronization.  Contact  service  dept.  in 
case of recurring anomaly. 
Contact service dept. 

 

 

Hand lowering 
To lower the platforms, raise the lift with the hand pump about  2 cm., lift the mechanical safety pawls using a wooden shim of 
about 3 cm and place it along the rack. (see diagram.) Unscrew with an hexagonal key (see diagram.) With a “5” hexagonal key 
unscrew  very  slowly  the  hand  lowering  valve  taking  care  of  the  lift  lowering.  when  the  lift  is  fully  lowered  screw  the  hand 
lowering valve. Once the trouble has been repaired, raise the lift and remove the wooden shims. 

 
 
 
 
 
 
 
 
 
 
 
 
 

CHAPTER 8-ACCESSORIES

 

 
Available optionals are: 

 

Set of extension hoses  

Содержание GLP99SM

Страница 1: ...SCISSOR LIFT FREE WHEELS GEMINI LOW PROFILE OPERATING INSTRUCTIONS GLP99SM GLP99SM P...

Страница 2: ...WITH THE FOLLOWING EUROPEAN DIRECTIVES 98 37 CEE 73 23CEE 93 68 CEE 89 336 IT ALSO DECLARES THAT THE FOLLOWING EUROPEAN RULES HAVE BEEN RESPECTED EN 292 1 EN 292 2 EN294 EN 349 EN 1050 EN 60204 1 ETS...

Страница 3: ...N 291 1992 EN 292 1992 EN 294 EN349 EN1050 EN 60204 1 EN 300683 EN 55022B Only skilled and previously authorized technicians should be allowed to carry out transport assembling setting maintenance ove...

Страница 4: ...sed versions They have been designed and built for car van lifting and placing operations Our car lifts are equipped as follows A BASE Fixed structure B BOOMS PLATFORM Lifting and travelling structure...

Страница 5: ...be padlocked to prevent the use of the lift during the maintenance 1 position the lift is powered GLP99SM GLP99SMP double scissor car lifts are able to lift vehicles and van whose weight is no more t...

Страница 6: ...he lift 4 Never use the lift without protection or when safety devices are off line 5 Always use the rubber pads when lifting a vehicle observing the proper points of support specified by the vehicle...

Страница 7: ...LD BE ALLOWED TO INSTALL THE CAR LIFT SERIOUS DAMAGE TO PEOPLE OR EQUIPMENT CAN BE CAUSED IF THIS RULE IS NOT FOLLOWED The lift must be installed according to the specified safe distance from walls co...

Страница 8: ...ctric card of the power unit WIRING CONNECTIONS POSITION N CODE DESCRIPTION 1 06 0302 Lifting limit switch 4 06 6607 Photoelectric cell 3 06 0302 P2 platform self levelling 5 06 0302 P1 platform self...

Страница 9: ...9 WIRING DIAGRAMS...

Страница 10: ...10 WIRING DIAGRAM...

Страница 11: ...11 WIRING DIAGRAM...

Страница 12: ...ORS K1 17 RELAIS D1 37 DIODS R1 44 RESISTORS DL LED SPRI BLEEPER S1 RESET TIMER BUTTON S2 TIMER REGULATOR IC4 TIMER MICROCHIP ICS BLEEPER MICROCHIP C1 24 CAPACITOR TR1 5 TRANSISTORS IC 1 2 3 5 VOLTAGE...

Страница 13: ...4 3001 LEVELLING P2 DELIVERY C 04 3004 PIPE CONNECTION H P1 HYDRAULIC PLAN 1 PARACHUTE VALVE 6 3 5 L PUMP 2 LEVELLING ELECTRO VALVE EL 7 THREE PHASE MOTOR 4 HP 3 LOWERING ELECTRO VALVE EO 8 SUCTION FI...

Страница 14: ...n power supply is disconnected to avoid the possibility of electrocution COMMERCIAL PARTS WIRING PLANT Position n Denomination Manufacturer Type Max Appl Proximity SIEMENS 10 30V DC pnp NC 0 3A Sn1 2m...

Страница 15: ...tform so that they are in line with the lifting points specified by the manufacturer Press the lifting button keep it pressed until the required height is reached To lower the lift press the lowering...

Страница 16: ...al capacity cannot be lifted Max pressure valve malfunction Suction filter malfunction Worn pump Contact service dept Clean the suction filter or contact service dept Replace the pump Platform out of...

Страница 17: ...icated on chapter 3 and 6 when making the substitution of the spare parts and the repair intervals Spare parts ordering procedure When ordering spare parts the following must be clearly specified Car...

Страница 18: ...18...

Страница 19: ...19 FIG 3 LEVERS AND PISTON FIG 4 PLATFORM...

Страница 20: ...20 FIG 5 CONTROL BOX...

Страница 21: ...21 FIG 6 ELECTRIC COMPONENTS FIG 7 SAFETY ELEMENTS FIG 8 RAMPS...

Страница 22: ...RICTION WASHER 16 17 02 2229 LOWER BOOM COUPLING PIN 4 18 03 3525 25x28x30 SELF LUBRICATIN BUSHING 24 19 02 2209 BOOM FASTENING PIN 8 20 01 2214 SLEIGHT 4 22 01 2215 NYLON SKATE 4 23 02 2224 HOSE SUPP...

Страница 23: ...X16 TCEI BOLT 3 33 04 4598 ACCOUPLEMENT JOINT 1 34 05 5000 AIR ELECTROVALVE 1 35 05 4040 AIR FILTER 1 36 05 5512 90 1 8 x 6 UNION ELBOW 2 37 05 5514 AIR ELECTROVALVE CONNECTOR 1 FIG 6 ELECTRIC COMPONE...

Страница 24: ...om walls columns ceiling other machines etc 3 Power supply line check 4 Lift levelling check 5 Lift working check 6 Hydraulic safeties working check 7 Electric safeties working check 8 Loaded lift che...

Страница 25: ...t of visit Positive Negative Installer Stamp and signature User Stamp and signature Date Next test on RECURRING OR OCCASIONAL VISIT N DESCRIPTION OF TEST YES NO Notes 1 Lift maintenance and cleaning c...

Страница 26: ...tic failure check 4 Safety devices working check MONTLY TESTS 1 Lift through cleaning 2 Rollers slides check 3 Cylinders air bleeding if necessary HALF YEARLY TESTS 1 Oil level check 2 High pressure f...

Страница 27: ...Stamp and signature REPAIR FAILURE ACTION Date Stamp and signature October 2000 BY THE GRAPHIC DEPARTEMENT A R ROTARY LIFT EUROPE S r l Via Tiburtina Km209 800 65025 Manoppello Scalo PESCARA ITALY Te...

Отзывы: