11. Assembly
45
Rev.D 2013_03_en
1.
Insert the supplied threaded pins (2) from above
through the top plate of the lift column and at-
tach using 2 lock nuts (1) with washers for each
pin (
Fig. 45 and 46).
2.
Insert the threaded pin (2) from above into the
latch bar.
3.
Adjust the latch bar (3) using the hex nuts (1) in
such a way that it lies in a circular recess on the
floor but does not make contact with the floor.
4.
Tighten the hex nuts at top and bottom slightly,
but do not yet tighten them fully.
5.
Lock at the top using the M20 lock nut.
6.
Screw the threaded sleeve (4) for the cable (5)
into the top plate from below so that the cable is
lightly tensioned. Do not yet secure the cable.
7.
Secure the threaded sleeve at the top with an
M20 lock nut and then with a jam nut.
11.12 Attach the flexible hose
47
8.
Route the cable assembly with the electrical,
pneumatic and hydraulic cables through the
flexible hose into the control box.
9.
Make sure that the flexible hose sits securely in
the metal fitting of the fixed runway.
10.
Then tighten the 2nd metal fitting on the control
box.
11.13 Assemble the hydraulics module
Only qualified staff with specialist knowledge and
experience of hydraulics may work on hydraulic
equipment.
Always follow the safety regulations in the hy-
draulic power unit instructions in the annex to
this manual.
The hydraulic power unit with motor and tank is
supplied separately and is assembled as follows:
1.
Screw the 4 threaded pins with rubber pads (2)
into the lift columns.
CAUTION
Risk of injury from heavy hydraulic
power units.
If possible, assemble the complete unit in
pairs.
2.
Attach the complete hydraulic power unit to the
4 threaded pins with the mounting plate (3), fit
spacers and secure with self-locking nuts.
48
Содержание AR43-5MB
Страница 2: ......
Страница 4: ......
Страница 40: ......
Страница 49: ...11 Assembly 43 Rev D 2013_03_en cross beams leaving a 1 mm gap and align pre cisely using a spirit level ...
Страница 62: ...56 Rev D 2013_03_en ...
Страница 63: ......