background image

Operation and Maintenance Manual for Rosenberg 

 Compact ventilation appliance series SupraBox Comfort 

Overhead devices

 

 

 

 

BA 113 BB 10/12/A/SupraBox 

 

14

5. General Installation Instructions 

5.1 Installation of the unit 

 

The Rosenberg-SupraBox Comfort overhead version must be installed on a ceiling 
which is professionally constructed and statically suitable for this specific use. 

 

Assumption of static or dynamic building functions by Rosenberg devices must be 
excluded. Otherwise the warranty by Rosenberg Ventilatoren GmbH will expire for 
damages to the device or resulting damages to the building. 
 

Installation and assembly may only be made by trained staff, familiar with the specific accident 
prevention regulations and general safety-related and occupational health laws.  

 

In addition to the static analysis for the overhead construction also consider the following instructions: 
 

  The suspension must be level and without torsion.

 

 

  The horizontal inclination angle of the device may not exceed a maximum of 2%.

 

 

  Choose an installation space with an unobstructed condensate drain and water trap, as well 

as a sufficient gradient of the condensate line. 

 

 

  The height level between installation space and the floor/intermediate ceiling must guarantee 

a professional condensate drain from the functional parts.

 

 

Consider the height of the waste trap! 

  
 
In order to ensure low noise operation consider the following advice: 
 

  Low air velocity in the duct 

 

  Do not install the device on a wooden ceiling 

 

  Use a vibration resistant ceiling construction 

5.2 Assembly 
 

Get an overview of the quantity and description of all functional parts with help of the 
enclosed technical documents. Under item 2.2 unit overview or 2.3 unit drawing 
respectively there is a detailed drawing with all relevant dimensions. 
 
For an installation of the SupraBox in the intermediate ceiling or the area of 
operation respectively the inspection opening and space to the floor must be big 
enough for maintenance and revision. Permanent access must be guaranteed. 

 

 
 
 
 
 
 
 
 

Содержание SupraBox 1100D

Страница 1: ...GmbH Maybachstra e 1 74653 K nzelsau Gaisbach Tel 49 0 7940 142 0 Fax 49 0 7940 142 125 Email info rosenberg gmbh com www rosenberg gmbh com EN Betriebsanleitung Operating instruction SupraBox D Supr...

Страница 2: ...ions 14 5 1 Installation of the unit 14 5 2 Assembly 14 5 3 Connection of the ventilation ducts to the unit 15 5 4 Electric Installation 16 5 5 Connection of the condensate exhaust air and overflow pi...

Страница 3: ...10 12 A SupraBox 2 1 General Safety Information 1 1 Warning regarding Health and Safety The following icons inform about certain hazards or safe use Attention Danger Safety Advice Hazard by electricit...

Страница 4: ...ngle instance of the prescribed power limit being exceeded will inevitably cause damage to the built in components which results in the safe use of the appliance being compromised Only approved materi...

Страница 5: ...ing and condensate will be dissipated in a condensate pan with gradient all around Unit is ready prepared for connection to isolation drop rod by the customer The compact housing consists of corrosion...

Страница 6: ...erating point 1048 Ws m 1421 Ws m SFP class In the operating point SFP2 SFP3 Heat recovery Efficiency Reverse flow plate heat exchanger up to 92 corresponding to WRG classes H1 Maximum value on conden...

Страница 7: ...ox 6 1 Panel filter exhaust air F5 7 Loops transport loops 2 Reverse flow heat exchanger 8 Control box incl control system 3 Bypass flap 9 Supply fan with EC motor 4 Condensate pan 5 Panel filter inco...

Страница 8: ...Rosenberg Compact ventilation appliance series SupraBox Comfort Overhead devices BA 113 BB 10 12 A SupraBox 7 2 3 Device drawings Suprabox 1100 D SB110DGRIB00 A hose with appropriate hose sleeve is r...

Страница 9: ...Manual for Rosenberg Compact ventilation appliance series SupraBox Comfort Overhead devices BA 113 BB 10 12 A SupraBox 8 Suprabox 1900 D SB190DGRIB00 A hose with appropriate hose sleeve is recommended...

Страница 10: ...aseous media according to the criteria stated below The compact ventilation appliance is suitable for the conveyance of Clean air low dust air or low greasy air Slightly aggressive gases or fumes cons...

Страница 11: ...ding the device from the transport vehicle Furthermore the completeness of the delivery scope must be checked in accordance with the freight documents Missing parts or damages must be noted immediatel...

Страница 12: ...appropriate anti slip gloves and safety shoes for the transport For the transport with forklift or pallet truck please note the following instructions The transport with industrial trucks requires reg...

Страница 13: ...It is forbidden to stay below floating loads For direct load attachment underdragging the load only use exclusively licensed undamaged fabric slings with sufficient contact surface and edge protection...

Страница 14: ...and bumping 4 3 Storage Make sure to store the unit in a dry and weather protected area On receipt of the merchandise the packaging film and tape must immediately be removed in order to avoid condens...

Страница 15: ...l and without torsion The horizontal inclination angle of the device may not exceed a maximum of 2 Choose an installation space with an unobstructed condensate drain and water trap as well as a suffic...

Страница 16: ...n site Furthermore the electrical supply as well as external sensors or optional accessories such as duct heaters etc must be connected The remote operator control must be connected to the control sys...

Страница 17: ...e exhaust air and overflow pipes The Suprabox is equipped with a condensate pan including an all side gradient in the exhaust air The condensate drain consists of an aluminium circular tube of 15 x 2...

Страница 18: ...Remove a possible protective film Optical inspection of the unit gaskets for damage Re adjust the hinges of the maintenance doors Close all doors Operational check of the fans Pressure control of the...

Страница 19: ...make sure that it will not be switched on unintentionally This step disconnects the compact unit from the mains with all poles Be aware that the control box will still be hot For maintenance at the c...

Страница 20: ...t according to the latest version of the VDI guideline Please find instructions for the cleaning and hygiene inspection of each functional part of the device below 7 3 Maintenance and Cleaning of the...

Страница 21: ...and the corresponding frost protection if the outside temperature is less than 5 C and operate them if necessary in order to prevent the unit from frost damage Check the unit for forgotten tools forei...

Страница 22: ...the wheel The gap cover R should be about 1 to 2 of the wheel diameter Adjustment of the cone If the wheel is rubbing at the cone after installation of the unit adjust it as follows Abb Adjustment of...

Страница 23: ...andard operational conditions air temperature increased dust pollution or constant high humidity or in case of continuous 24 hour operation a shorter interval must be determined Maintenance fan unit E...

Страница 24: ...ter or the cleaning agent respectively should have a neutral ph value 6 8 7 5 Reverse flow heat exchanger 7 5 1 Startup Check the correct operation and direction of movement of the bypass flaps of the...

Страница 25: ...on and maintenance is necessary In addition the integrated damper servomotor and fastener need regular checks and maintenance In case of heavy dirt the reverse flow heat exchanger can be removed with...

Страница 26: ...the same with heat exchanger 3 6 pict heat exchanger removal In order to ensure a safe assembly of the heat exchanger the above listed steps have to be executed in reverse order Maintenance Every 3 mo...

Страница 27: ...angle rail to the body in order to change the filter and remove it afterwards Pay attention to the correct fit of the filter at the frame after the re assembly During the filter change check the seal...

Отзывы: