55
19. INFORMATION ON DISPOSING (THROWING AWAY) AND DISMANTLING
(PULLING APART) OF THE STOVE
Dismantling and throwing away, or disposing of an old used stove is the sole responsibility of the owner.
The owner of the boiler must abide by the regulations in his/her country related to the safety and
environment protection. Dismantling and disposing of the boiler may be left to a third party to do if the
third party is a company authorized to collect and dispose of such materials.
NOTICE:
In all cases you must abide by the applicable regulations of the country where the stove is
installed regarding disposal of such materials (things) and, if necessary, report the disposal of such items.
ATTENTION
Dismantling the boiler must be done only when the chamber of the boiler is not working and when the
boiler is unplugged from power (no power supply).
•
pull out all electric parts,
• throw away the batteries and electronic cards of the remote control in the proper garbage cans in
accordance with the standards.
•
separate the batteries you are keeping from the electric cards,
• dismantle the stove with the help from an authorized company
ATTENTION
Disposing of the boiler in public places poses a serious risk for people and animals.
In such cases it is
always the responsibility of the owner if a person or an animal gets hurt.
When the boiler is dismantled, this manual and all other documents related to the boiler must be
destroyed.
20. THE DURATION OF GUARANTEED SERVICE
By this we mean the time in which we guarantee service, accessories, and spare parts, starting from the
date of purchase of the appliances.
The time of the guaranteed service is in accordance with the legislation.
In case of a change of the model and design of the appliance, the deadline for replacing the parts for
which the design has been changed is within the legal deadline.
After this period the affected parts are provided in the new designs.
Содержание SM ECO 25
Страница 7: ...7 Figure 1 Boiler SM ECO 33 compact ...
Страница 36: ...36 ...
Страница 37: ...37 Figure 28 Power Fan Temperature Fuel Time Settings ...
Страница 44: ...44 16 6 ELECTRICITY SCHEME Figure 30 Electricity scheme ...
Страница 47: ...47 ...
Страница 48: ...48 16 8 ALARMING SITUATION ...
Страница 49: ...49 ...
Страница 50: ...50 ...
Страница 51: ...51 ...