Step 3 - Fixing the Panel to the Wall Profile
1. Place the Setting Blocks onto the bottom of the Panel Glass, ensuring the end marked “A” is on the glass.
2.
Carefully lift the Panel Assembly over the Wall Profile and carefully push it until it is fully home, there must
be a minimum of 10mm for fixing.
3. On the inside of the enclosure, with the 2.5mm drill bit (supplied), drill a hole into the Vertical Frame and
Wall Profile approximately 100mm from the top and bottom and one in the centre. Drill 2 holes between
these (5 holes in total).
• Ensure the Panel is completely vertical (the bubble on the Spirit Level must be in the centre of the 2 lines).
4.
Fasten the Panel to the Wall Profile using the 9mm screws supplied.
5.
Seal the Wall Profile vertically top to bottom, both internally and externally where it meets the tiles.
IMPORTANT: Failure to carry out this stage may result in serious water damage and is not covered under
the terms of the guarantee.
• Allow 24 hours for the sealant to fully cure prior to using the shower.
6. Remove the setting blocks from the bottom of the door.
NOTE: 2 people will be required to carry out these operations. Some parts are hidden for clarity reasons.