IMPORTANT PRE-INSTALLATION CHECKS
1. Check the tray is level, on all sides (The bubble should be in the centre of the two lines on the spirit level).
2. Stand in the tray and check there is no adverse movement.
3. The walls should be tiled and grouted prior to installing the enclosure.
4. The tiles and the tray should be sealed, using bathroom sealant.
•
Spray the seal and joints with the shower head and check for leaks.
•
Check the plumbing for leaks.
•
Do not grout the tiles when the enclosure has been fitted as the grout may discolour the aluminum profiles.
•
Make sure the tray is installed as per the manufacturers instructions.
•
When all of the above criteria is complete please proceed to the next step in these instructions.
Step 1 - Checking the tray
Component Check List: Supplied
Description
Quantity
FC13
FCG13
Curved Panel
1
1
Side Panel
1
Wall Profiles
1
2
Wall Profile Trims
1
2
Brace Bar Assemblies
1
1
Fixing Kit - Component Check list.
40mm Screws
4
7
Wall Plugs
4
7
16mm Pan Head Screws
3
6
Branding Badge (where applicable)
1
1
Profile Cover Caps
2
4
2.5mm Allen Key
1
1
3mm Allen Key
1
1
3mm Drill Bit
1
1
Location Pin
1
1
Equipment Check List: Not Supplied
Description
Mains or battery drill.
6mm masonry drill bit.
Bathroom sealant gun.
Bathroom sealant tube.
Pozi Screw driver.
Flat Head Screw Driver.
Spirit levels.
Tape measure.
Pencil.
Additional fixings if going into plaster board.
FC:CQB
4/5/10
12:13 Page 2