23
Skyline & R-Series
Cassette 120 Fabrication
Step 1: Cut (use RollEase deduction charts to
calculate width of cuts)
1a. Cut Headrail
1b. Cut Tube
1c. Cut Hem Bar
1d. Cut Fabric for shade and for Cassette insert
Step 2: Assemble Shade
2a. Attach Hem Bar to Fabric
2b. Attach Fabric to tube
2c. Attach Bead Chain or Cord to Clutch
2d. Attach Tension Device to Cord or Bead
Chain (See SH3 Instructions)
Step 3: Insert Fabric Strip into Cassette Headrail (Cassette insert should be cut 4”-4-1/16” wide,
and as long as the total length of the headrail)
3a. Apply two sided tape to headrail
3b. Insert fabric into groove in headrail, beginning on either side rolling fabric over the headrail
and slipping into the groove on the opposite side.
Step 4: Insert Clutch and Idler
4a. Insert Clutch
4b. Insert Idler
3a.
3b.
Skyline
R-Series
4a.
4b.
4a.
4b.
Align grooves
of housing
around ribs
of tube
Cassette 120
Slowly tuck in fabric starting at one side
of the cassette and moving to the other