background image

B

B

 

3/4"

19mm 

 

1"

25mm 

CRIMP

LOCATION

SECTION B-B

SCALE 1 : 1

C

ROLLEASE

ACMEDA 

DIMENSIONS 

IN "MM"

SCALE:1:50

SIZE:

A3

PROPRIETARY & CONFIDENTIAL

THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF 

ROLLEASE ACMEDA.  ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE 

WRITTEN PERMISSION OF ROLLEASE ACMEDA IS PROHIBITED.

ITEM CODE:

PRODUCT SPECIFICATION SHEET

19 Apr 2018

DRAWN:

www.rolleaseacmeda.com

ITEM DESCRIPTION:

REV.

 

E

E

F

SECTION E-E

 CRIMP LOCATION 

EXCESS

WIRE

MARKED

POSITION

 

0.20in

5mm  

DETAIL F

SCALE 1 : 1

G

G

H

SECTION G-G

DETAIL H

SCALE 1 : 1

I

 x 

DETAIL I

SCALE 1 : 1

C

ROLLEASE

ACMEDA 

DIMENSIONS 

IN "MM"

SCALE:1:10

SIZE:

A3

PROPRIETARY & CONFIDENTIAL

THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF 

ROLLEASE ACMEDA.  ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE 

WRITTEN PERMISSION OF ROLLEASE ACMEDA IS PROHIBITED.

ITEM CODE:

PRODUCT SPECIFICATION SHEET

19 Apr 2018

DRAWN:

www.rolleaseacmeda.com

ITEM DESCRIPTION:

REV.

 

NOTE: x = 20mm [0�80”] uncompressed

Attach nut to lock hollow bolt in place

Page� 02

Wireguide Skylight Installation Manual | November 2018

2018 ©Copyright All Rights Reserved Rollease Acmeda

INSTALL BOX & GUIDE WIRE

STEP 1� FIX BOXES RELATIVE TO INSTALLATION SPACE

STEP 2� INSERT SPRING ONTO WIRE THEN CRIMP THE WIRE TO THE DOMED TERMINAL

STEP 3� INSERT WIRE (WITH SPRING) INTO L-BRACKET

STEP 4� PULL TIGHT & MARK WIRE

STEP 5� INSERT WIRE INTO BOLT & CRIMP

SECTION B: 

| INSTALLATION

STEP 6� ASSEMBLE & TIGHTEN

NOTE: 

Tighten wire to compress 

spring by 5mm [0�20”]

[Approximately 5 turns]

NOTE:

Position bolt 5mm [0�20”] past Marked Position�

Excess wire can be removed after crimping�

E

E

F

SECTION E-E

 CRIMP LOCATION 

EXCESS

WIRE

MARKED

POSITION

 

0.20in

5mm  

DETAIL F

SCALE 1 : 1

G

G

H

SECTION G-G

DETAIL H

SCALE 1 : 1

I

 x 

DETAIL I

SCALE 1 : 1

C

ROLLEASE

ACMEDA 

DIMENSIONS 

IN "MM"

SCALE:1:10

SIZE:

A3

PROPRIETARY & CONFIDENTIAL

THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF 

ROLLEASE ACMEDA.  ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE 

WRITTEN PERMISSION OF ROLLEASE ACMEDA IS PROHIBITED.

ITEM CODE:

PRODUCT SPECIFICATION SHEET

19 Apr 2018

DRAWN:

www.rolleaseacmeda.com

ITEM DESCRIPTION:

REV.

 

E

E

F

SECTION E-E

 CRIMP LOCATION 

EXCESS

WIRE

MARKED

POSITION

 

0.20in

5mm  

DETAIL F

SCALE 1 : 1

G

G

H

SECTION G-G

DETAIL H

SCALE 1 : 1

I

 x 

DETAIL I

SCALE 1 : 1

C

ROLLEASE

ACMEDA 

DIMENSIONS 

IN "MM"

SCALE:1:10

SIZE:

A3

PROPRIETARY & CONFIDENTIAL

THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF 

ROLLEASE ACMEDA.  ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE 

WRITTEN PERMISSION OF ROLLEASE ACMEDA IS PROHIBITED.

ITEM CODE:

PRODUCT SPECIFICATION SHEET

19 Apr 2018

DRAWN:

www.rolleaseacmeda.com

ITEM DESCRIPTION:

REV.

 

Swage Tool + jaws available through Rollease Acmeda
Contact support via rolleaseacmeda�com

Содержание WireGuide Skylight

Страница 1: ...November 2018 WIREGUIDE SKYLIGHT INSTALLATION MANUAL...

Страница 2: ...mages incurred by you resulting from errors in or omissions from the information included herein Rollease Acmeda reserves the right to make changes without further notice to any products to improve re...

Страница 3: ...stallation Manual November 2018 2018 Copyright All Rights Reserved Rollease Acmeda ASSEMBLED PARTS SECTION A ITEMS REQUIRED 1 2 3 4 5 1 Spring Fabric Box 2 Motor Spool Box 3 Spring Fabric Tube 4 Motor...

Страница 4: ...CRIMP THE WIRE TO THE DOMED TERMINAL STEP 3 INSERT WIRE WITH SPRING INTO L BRACKET STEP 4 PULL TIGHT MARK WIRE STEP 5 INSERT WIRE INTO BOLT CRIMP SECTION B INSTALLATION STEP 6 ASSEMBLE TIGHTEN NOTE T...

Страница 5: ...FER TO PRE TENSION CHARTS FOR PRE TURNS REQUIRED SEE FOLLOWING PAGES Rollease Acmeda does not recommend exceeding suggested pre turn values SECTION B INSTALLATION Pre Turn Spanner available through Ro...

Страница 6: ...7 17 18 18 18 18 18 18 17 17 17 17 17 17 4 17 17 17 17 17 17 17 16 16 16 16 16 16 16 1 40 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 15 15 5 1 60 15 15 15 15 15 15 16 16 15 15 15 15 15 15 15 1...

Страница 7: ...18 18 18 18 18 18 18 18 18 18 1 20 18 18 18 19 19 19 19 19 19 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 1 40 18 18 18 18 18 18 17 17 17 17 17 17 17 17 17 17 17 17 17 5 1 60 17 17 17...

Страница 8: ...nual November 2018 2018 Copyright All Rights Reserved Rollease Acmeda INSTALL MOTOR SPOOL TUBE INTO BOX STEP 1 INSTALL MOTOR HEAD ONTO MOTOR BRACKET SECTION B INSTALLATION STEP 2 SWING IDLER END INTO...

Страница 9: ...Rollease Acmeda INSTALL SPOOL CORD STEP 1 UNLOCK PRE TENSION IDLER SECTION B INSTALLATION LEFT HAND SPRING UN LOCKED NOTE TAKE DOWN TUBE IF PRE TURNS NEED TO BE ADDED REMOVED R PULL WEIGHT BAR OUT CH...

Страница 10: ...EP 1 TEST OPERATION OF SKYLIGHT STEP 2 IF NO CHANGES ARE REQUIRED ASSEMBLE WEIGHT BAR END CAPS STEP 1 SWING BOX COVERS INTO PLACE FUNCTION CHECK INSTALL BOX COVERS SECTION B INSTALLATION STEP 2 FIX IN...

Отзывы: