Installation

AutoCharge:EV OpenCharge

EVACOCM-01-V02-R3 Installation and Operation Manual

Page 

9

of 

21

December 2021

Installation

IMPORTANT: 

Installers and End Users

must

read and 

understand

the content 

of this manual before installation and/or use of the product.

Installation must 

only

be performed by someone who is properly qualified and 

competent to do so in accordance with the current legislation in force in the 

geographical location of the installation.

x

Advice provided in this manual does NOT override any legislation.

x

Rolec Services Ltd cannot accept any responsibility for improper installation or any 

problems arising from improper installation.

NOTE: 

Damage to the equipment, connected systems or to property caused by 

improper installation are the responsibility of the installer.

Before Installation

1. Establish a suitable site location for the charger that is both secure and 

environmentally safe.

2. Make sure the location meets current legislation (if applicable).
3. Make sure that the charger and any accessories have not been damaged in 

transit.

NOTE

: Items damaged in transit must first be reported to the courier and then to the 

supplier.
Where possible, photographic evidence of package and/or unit damage should be 

supplied.
4. Make sure the charger model is correct and matches the order.

NOTE

: Incorrect or damaged units must NOT be installed. Contact your supplier to 

discuss rectification.

5. AutoCharge:EV OpenCharge units using GPRS to communicate with the cloud-

based back office require a suitable GPRS signal of 14 CSQ or better.

NOTE

: Units using GPRS contain a roaming SIM card which will always connect to the 

strongest signal available. It is assumed that a suitable GPRS signal has already been 

verified by the end user/installer prior to installation.

x

Rolec cannot be held responsible or accountable in the event a GPRS unit is 

installed in a location without adequate network signal.

Base Installation – If Supplied:

1. Prepare the ground and set the ground mounting base in the desired location.

x

Make sure ALL cables are fed upward through the middle of the base.

2. Concrete the base into place and allow time for it to set.

x

The lip of the base should be 2 – 3 mm above the surface.

Содержание OCPP0010

Страница 1: ...AUTOCHARGE EV EV OPENCHARGE GPRS Ethernet Communication INSTALLATION OPERATION MANUAL MODELS SINGLE PHASE OCPP0010 1 X 3 6kW OCPP0011 1 X 7 2kW OCPP0020 2 X 3 6kW OCPP0021 2 X 7 2kW 3 PHASE OCPP0012 1...

Страница 2: ...hase OCPP0010 OCPP0011 OCPP0020 OCPP0021 Three Phase Superfast OCPP0012 OCPP0013 OCPP0022 OCPP0023 Document Type Installation and Operation Manual Document Code EVACOCM 01 V02 R3 Language UK English O...

Страница 3: ...nstallation 9 Base Installation If Supplied 9 If a Base is Not Supplied 10 Schematics 10 Install the Charger 14 Commissioning 15 Commissioning with VendElectric 15 After Installation 15 Operation 16 V...

Страница 4: ...do so by the manufacturer x Do NOT attempt to repair the equipment unless specifically instructed to do so by the manufacturer x To maintain electrical safety the body enclosure of the product access...

Страница 5: ...ge OCPP Superfast 1x 11kW 16A Type 2 socket OCPP0013 AutoCharge EV OpenCharge OCPP Superfast 1x 22kW 32A Type 2 socket OCPP0022 AutoCharge EV OpenCharge OCPP Superfast 2x 11kW 16A Type 2 sockets OCPP0...

Страница 6: ...mensions 1275 x 323 x 270 mm HxWxD Material Steel Enclosure Mass 24 5kg Operating Temperature 30 C to 50 C Operating Humidity Range 5 to 95 Figure 1 General Arrangement and Dimensions 2 socket model s...

Страница 7: ...0Hz Single Phase Cable Terminals 3x 50mm Single Phase Communications GPRS Requires a signal strength of 14 CSQ or better or Requires an RJ45 ethernet cable Operating Temperature 30 C 50 C Product Code...

Страница 8: ...n x Enclosure IP54 Socket IP54 BS EN 60529 1992 A2 2013 x Enclosure IK10 BS EN 62262 Plug s Socket s x BS EN 62196 1 2014 BS EN 62196 2 2017 Fire Rating x UL94 Flame Rating at V2 for 1 5mm and 3 0mm R...

Страница 9: ...nt enclosure Labels may be in the form of adhesive stickers plates and or moulded into the surface of components Information Labels Figure 2 Typical Product Rating Label Figure 3 Typical Fascia Label...

Страница 10: ...arger and any accessories have not been damaged in transit NOTE Items damaged in transit must first be reported to the courier and then to the supplier Where possible photographic evidence of package...

Страница 11: ...Single Socket AutoCharge EV OpenCharge Schematic ACEN0095 C20 1 2 O OFF ACEQ0040 C6 2 N N 1 N N T A2 A1 14 11 12 WHITE J602 X1 X603 X601 X602 X600 1 7 6 2 4 5 1 3 4 6 WHITE 1 2 3 14 11 25 E CP PP N L3...

Страница 12: ...NG CONTROLLER RHS VIEW GREENFLUX SMART CHARGING CONTROLLER LHS VIEW 2 1 10 8 13 8V Max 2A Max 24Watt OUTPUT 12V 2A E CP PP N L3 L2 L1 V N INPUT 100 240VAC 0 88A 50 60Hz A1 L V 11 A2 12 14 3 2 1 SOCKET...

Страница 13: ...50Hz 1 3 5 7 24 23 21 20 2 4 6 8 ACEQ0040 C6 2 N N 1 N N T ACEO0240 63A 30mA 400 415V 50 60 Hz N 1 3 5 N 2 4 6 LIVE 1 LIVE 2 LIVE 3 NEUTRAL EARTH A1 A2 WHITE J602 X1 X603 X601 X602 X600 1 7 6 2 4 5 1...

Страница 14: ...12V 2A E CP PP N L3 L2 L1 V N INPUT 100 240VAC 0 88A 50 60Hz A1 L V 11 A2 12 14 3 2 1 SNUBBER SOCKET 1 SOCKET 2 A B 1000imp kWh DTS353F 2 EN50470 1 3 kWh 25 C to 55 C 3X230 400V 0 25 5 80 A 50Hz 1 3 5...

Страница 15: ...tallation IMPORTANT NOTE It is the responsibility of the installing engineer to satisfy themselves that all cable terminations throughout this product are secure and tight and have not become loose st...

Страница 16: ...reliminary tasks listed in the Host s Guide shown at the end of this manual must have been performed by the customer Host before commissioning can proceed 2 To complete commissioning refer to the Inst...

Страница 17: ...r to the EV Driver App User Guide included within the charger packaging Status Indicator Guide Flashing blue light Socket Available Flashing green light Socket Available for Plug and Go charging optio...

Страница 18: ...ions 3 Charging cables should be routed between the charger and the vehicle so as not to cause an obstruction or trip hazard 4 Charging cables must NOT be left connected to the charger when not in use...

Страница 19: ...eer in accordance with applicable regulations for the region of use A typical maintenance inspection and testing schedule is provided on the next page This schedule alternates on a quarterly basis bet...

Страница 20: ...sical damage x All warning labels present and legible x Status Indicators operating and displaying correct status x If installed check the condition of the charging socket contacts and socket flap x I...

Страница 21: ...vises the Client how this can be done during the handover process We also recommend that you consider entering a service and support agreement with your preferred Installer to ensure you are covered f...

Страница 22: ...3 CONTACT US 4 COMPLETE For more information call 01205 725765 Email support vendelectric com Or visit vendelectric com As a part of its services VendElectric will routinely monitor the connectivity a...

Страница 23: ......

Страница 24: ...THE UK S LEADING MANUFACTURER OF EV CHARGING POINTS t 01205 724773 e enquiries rolecserv co uk www rolecserv com...

Отзывы: