
Trying Out the Instrument
R&S
®
ZNLE
45
Getting Started 1323.2873.02 ─ 08
7. The calibration dock widget indicates the standard measurements that make
up a "Trans Norm" calibration.
Select "Through (mm)" to initiate the measurement of the connected Through
standard. Measuring the isolation between ports 1 and 2 is optional. Skip it for
now.
The analyzer performs a calibration sweep for the measured quantity S
21
. The
magnitude and phase of the result is displayed in two diagrams, together with
the expected typical result for a Through standard. The similarity of real and
expected traces indicates that the Through standard has been properly con-
nected. After the R&S
ZNLE has completed the calibration sweep and calcula-
ted the correction data, the "Apply" button is enabled.
8. Select "Apply" to close the wizard.
The system error correction is calculated and applied to the current channel. A
"Cal" label appears in the trace list.
To proceed with the measurement, remove the Through standard and connect the
DUT again.
Performing Measurements