Unpacking and Checking the Instrument
To remove the instrument from its packaging and check the equipment for com-
pleteness, proceed as follows:
●
Check the package for damage.
●
Carefully unpack the instrument and the accessories.
●
Check the package contents for completeness using the delivery list see
(
Chapter 4.1.3, "Delivery List"
on page 13) and package contents.
●
Check the equipment for any visible shipping-related damage or other
mechanical problems, e.g. loose parts inside.
If there is damage or anything missing, contact the supplier and the carrier who
delivered the instrument.
Do not operate the instrument in this case.
Packing material
Retain the original packing material. If the instrument needs to be transpor-
ted or shipped later, you can use the material to protect the control ele-
ments and connectors.
The instrument must be stored in dry, closed indoor premises. If the instrument
was transported under extreme temperatures, it is recommended that you allow a
minimum of two hours to reach the appropriate temperature before operating the
instrument.
4.1.3
Delivery List
The instrument comes with the following components:
●
R&S
HMP power supply preloaded with two main fuses (230 V)
●
Fuses for 115 V operation
●
Universal cable set
●
Getting Started manual
●
Document folder containing safety instructions and information on the instru-
ments calibration