Trying out the instrument
R&S
®
SMM100A
45
Getting Started 1179.1335.02 ─ 04
5
Trying out the instrument
This chapter introduces the most important functions and settings of the
R&S
SMM100A step by step. The complete description of the functionality and its
usage is given in the R&S
SMM100A user manual. Basic instrument operation is
Chapter 7, "Instrument control"
Prerequisites
●
The instrument is set up, connected to the power supply, and started up as
described in
Chapter 3, "Preparing for use"
For the first signal generation tasks, you use the internal baseband and reference
signal, so you do not need any additional signal source. More complex signal
generation tasks, however, require an instrument equipped with additional options
and/or external signals. Each task description lists its prerequisites.
The screenshots in this description show a fully equipped instrument. Con-
sider that, the block diagram displayed on your particular instrument can dif-
fer from the one used in the example.
The instrument is manually operated via the touchscreen. Try out the following:
Generating an unmodulated carrier
................................................................ 45
Generating a digitally modulated signal
.......................................................... 48
Triggering the instrument with an external signal
............................................51
Enabling and configuring a marker signal
....................................................... 57
Verifying the generated signal with the graphics display
.................................58
.......................................................................... 61
Generating an EUTRA/LTE signal
...................................................................64
5.1
Generating an unmodulated carrier
We start out by generating a simple unmodulated signal. The R&S
SMM100A in
this example can be a base unit in its minimal configuration (i.e. with installed
R&S
SMM-B1006).
Generating an unmodulated carrier
Содержание 1440.8002.02
Страница 1: ...R S SMM100A Vector Signal Generator Getting Started 1179133502 Version 04 Ý S2 ...
Страница 6: ...Contents R S SMM100A 6 Getting Started 1179 1335 02 04 ...
Страница 14: ...Key features R S SMM100A 14 Getting Started 1179 1335 02 04 ...
Страница 28: ...Preparing for use R S SMM100A 28 Getting Started 1179 1335 02 04 Switching on or off ...
Страница 44: ...Instrument tour R S SMM100A 44 Getting Started 1179 1335 02 04 Rear panel tour ...
Страница 90: ...Instrument control R S SMM100A 90 Getting Started 1179 1335 02 04 Remote operation over VNC ...
Страница 92: ...Contacting customer support R S SMM100A 92 Getting Started 1179 1335 02 04 ...