3
2 Responsibility for product
,QDFFRUGDQFHZLWK(XURSHDQ'LUHFWLYHVWKHRZQHURUXVHURILQWKHLQVWDOODWLRQLVUHVSRQVLEOHIRU
complying with the following.
To ensure that the installation is kept in proper working order, the automatic gate must be subject
WRSHULRGLFDOPDLQWHQDQFHSHUIRUPHGE\TXDOLÀHGSHUVRQQHOLQDFFRUGDQFHZLWKWKHLQVWUXFWLRQV
of the manufacturer.
7KH DXWRPDWLF V\VWHP PXVW RSHUDWH LQ WKH RULJLQDO FRQGLWLRQV YHULÀHG GXULQJ LQLWLDO WHVWLQJ
conducted by the installer and in the presence of the end user.
'RQRWWDPSHUZLWKWKHRULJLQDOVHWWLQJV
In the event of a fault or malfunction of the automatic gate, disconnect the installation from
PDLQV HOHFWULFDO SRZHU DQG KDYH WKH LQVWDOODWLRQ VHUYLFHG E\ D TXDOLÀHG SURIHVVLRQDO 'R QRW
attempt to repair the installation or rectify the problem yourself.
In the event of any malfunction, stop using the automation system immediately and contact the
technical support service.
Failure to observe these instructions may lead to danger.
3 Maintenance
The ROGER TECHNOLOGY automation system for swing gates requires periodical maintenance to
keep it in proper working order and to ensure that it continues to function in complete safety.
Agree upon a periodical maintenance schedule with the installer.
ROGER TECHNOLOGY recommends servicing at 6 month intervals for normal usage. However, the
frequency of maintenance intervals may vary depending on intensity of usage.
In particular, all the safety devices must be checked periodically to ensure that they are working
correctly.
All installation, maintenance and repair work must be documented correctly, and the relative
documents must be made available to the user.
2.1
Periodical maintenance by user
&OHDQWKHOHQVHVRIWKHSKRWRFHOOVZLWKDVRIWFORWKGDPSHQHGVOLJKWO\ZLWKZDWHU'RQRWXVH
solvent or other chemical products, as this may damage the devices.
Clean the guide rails to remove any leaves or stones which could impede the movements of
the automation system.
Trim any plants encroaching into the area of action of the photocells or which could impede
the movements of the automation system.
'RQRW
direct water onto the parts.
2.2
Periodical maintenance by installer
'LVFRQQHFWWKHV\VWHPIURPPDLQVHOHFWULFLW\DQGXQORFNWKHJDWH
Check all parts for wear and deterioration. In particular, check all structural parts for wear
and corrosion. Replace any parts not in an adequate condition to ensure continued correct
operation.
Check the condition and tightness of all fastener screws.
Clean and lubricate, the turning pins, the hinges of the gate and the drive screw. Manually
check that the gate slides smoothly and without impediment.
Lock the gate and reconnect to mains electricity.
Check that all control devices, safety devices and limit switches function correctly.
Check the force settings.