18
EN
supplied.
7. Pass the connecting cable through the cable guide to
the centre of the linkage lever [detail
L
].
8. Insert the cable in the rubber cable guide located in
the supporting structure of the barrier [detail
M
]
9. Feed the cable into the control unit [detail
N
], ensuring
that the cable does not interfere with the movements
of the automation system.
10. Continue with the electrical connections.
4.3
BI/004 installation with ACS/BA/68
(pag. 7)
1. Pass the connecting cable through the crankshaft
and make it come out from the opposite side.
2. Partially tighten
the 12 screws [
B
] M10x16 as shown
in detail
1
.
3. Insert the rod holder [
A
] into the motor shaft.
4. Tighten the 12 screws [
B
] M10x16 until
fully secured
.
5. Put the cover [
C
] and fasten it with the 2 screws
supplied.
6. Insert the bracket [
D
] inside the boom
BA/68/3
or
BA/68/4
[
E
].
7. Remove the cap [F] and the cap holder.
8. Remove the upper led cover [
G
] and the shockproof
rubber [
H
] by 300 mm.
9. Fix the boom with the 8 self-drilling screws 4.8x19 [
I
]
keeping a distance as shown in detail
X
.
10. Pass the led strip [
L
] inside the led cover up to the
motor shaft and pull it out from the opposite side.
Replace the led cover and shockproof rubber and fix
the cap with the screws.
11. Fix the cable with the supplied cable tie [
M
].
12. Fix the boom and the bracket to the ACS/BA/68
support with the 4 screws M8x16 [
N
].
13. Open ACS/BA/68 by 180° and leave a visible cable
length of 160mm [
P
]. NOTE: The cable must NOT be
stretched.
14. Pass the connecting cable through the centre of the
linkage lever [detail
Q
].
15. Fasten the cable with the cable clamp located inside
the barrier supporting structure [detail
R
]
16. Feed the cable into the control unit [detail
S
], ensuring
that the cable does not interfere with the movements
of the automation system.
17. Continue with the electrical connections.
4.4
BI/001PC - BI/001PE - BI/004HP
installation with ACS/BA/68 (pag. 9)
1.
Remove the flange [
A
] from the crankshaft.
NOTE
: This product must be disposed of only
by qualified technical personnel, following
suitable procedures. Observe local legislation for
differentiated refuse collection.
2. Pass the connecting cable through the crankshaft
and make it come out from the opposite side.
3. Fasten the [
B
] boom support to the crankshaft with
the 4 [
C
] M12x80 screws.
4. Put the cover [
D
] and fasten it with the 2 screws
supplied.
5. Insert the rod fully inside the rod support [
E
] and
fasten it with the screw [
F
] M12x100.
6. Insert the bracket [
G
] inside the boom
BA/68/3
or
BA/68/4
[
H
].
7. Remove the cap [
I
] and the cap holder.
8. Remove the upper led cover [
L
] and the shockproof
rubber [
M
] by 300 mm.
9. Fix the boom with the 8 self-drilling screws 4.8x19 [
N
]
keeping a distance as shown in detail
X
.
10. Pass the led strip [
P
] inside the led cover up to the
motor shaft and pull it out from the opposite side.
Replace the led cover and shockproof rubber and fix
the cap with the screws.
11. Fix the cable with the supplied cable tie [
Q
].
12. Fix the boom and the bracket to the ACS/BA/68
support with the 4 screws M8x16 [
R
].
13. Open ACS/BA/68 by 180° and leave a visible cable
length of 160mm [
S
]. NOTE: The cable must NOT be
stretched.
14. Pass the connecting cable through the cable guide to
the centre of the linkage lever [detail
T
].
15. Insert the cable in the rubber cable guide located in
the supporting structure of the barrier [detail
U
]
16. Feed the cable into the control unit [detail
V
], ensuring
that the cable does not interfere with the movements
of the automation system.
17. Continue with the electrical connections.
5
Assembly ACS/BA/60 - ACS/
BA/68 in case of existing
installation (pag. 11)
BI/004
1. Remove the carter [
1
].
2. Remove the boom [
2
].
3. Remove the bionic arm support [
3
].
4. Remove the carter [
4
].
To install the
ACS/BA/60
boom support follow chapter
4.1.
To install the
ACS/BA/68
boom support follow chapter
4.3.
BI/001PC - BI/001PE - BI/004HP
1. Remove the carter [
1
].
2.
Remove the support flanges [
2
].
3. Remove the boom [
3
].
4.
Remove the flange of the motor crankshaft [
4
].
To install the
ACS/BA/60
boom support follow chapter
4.2.
To install the
ACS/BA/68
boom support follow chapter
4.4.
Содержание ACS/BA/60
Страница 2: ......
Страница 5: ...5 BI 004 with ACS BA 60 I M L A C D H G Fx4 BA 60 3 E 200 COVER A Bx12 M10x16 Bx12 M10x16 1 ...
Страница 6: ...6 BI 001PC BI 001PE BI 004HP with ACS BA 60 L N M A B Cx4 Gx4 H I F BA 60 3 D E 200 COVER ...
Страница 8: ...8 Q S R Nx4 P 160 mm Nx4 P 160 mm M L ALED 4C ...
Страница 10: ...10 V U T L P M Q Nx4 P 160 mm R Nx4 P 160 mm S ALED 4C ...