ROE MC-7H Скачать руководство пользователя страница 5

In order to protect against risk of electric shock, the installation should be prop
erly grounded. Defeating the purpose of the grounding type plug will expose you
to the risk of electric shock.   

of Leakage current. In order to avoid risk of electric shock due to high leakage 

Important warnings

Maximum and minimum ambient temperature:
The maximum ambient temperature for the LED wall is 45 °C; the minimum tem-
perature is -20 °C.
    
High leakage current:
The combination of  power boxes in an installation results in increased levels 

    

Data cables:
The data cables provided with this system have special properties for safety. 
They are not user serviceable. If the data cables are damaged, replace them 
only with new ones. Never try to repair a data cable. Per requirements of the 
National  Electrical  Code

®

  in  the  USA,  the  length  of  a  data  cable  must  not 

exceed 100 m (332 feet). Avoid exposure of data cables to accidental contact
with lightning or power conductors.

MC-7H Panels cannot be hot swapped:
Always disconnect the power cord from the control box before connecting or 

-

    

-

    

current, proper grounding of the installation is required.

Power system

Mains cords:
The power cords delivered with this system have special properties for safety. 
They are not user Serviceable. If the power cords are damaged, replace them 
only with new ones. Never try to repair a power cord.

- 5 -

disconnecting the cable string or one of MC-7H Panels.

This equipment MUST be earthed:

--

 

-

Содержание MC-7H

Страница 1: ...1 User Manual MC 7H with Touring frame BlackLED No transparency...

Страница 2: ...2 Control System Contents Safety Information 03 Specification 06 Connection 07 Physical Connection 14 Accessories Base bar Assembly 08 09 16 18 Package 17 Service and Maintance...

Страница 3: ...lling powering or servicing this product follow the safety precau tions listed below and observe all warnings in this manual and printed on the product If you have questions about how to operate the p...

Страница 4: ...stallation by installing panels at the top and working downwards Disassemble an installation by removing panels at the bottom and working upwards Check that all external covers and rigging hardware ar...

Страница 5: ...ey are not user serviceable If the data cables are damaged replace them only with new ones Never try to repair a data cable Per requirements of the National Electrical Code in the USA the length of a...

Страница 6: ...of lightweight and firm structure With the amazing flexibility and high density both of them can be able to multi angle folded satisfy your solution for applications with long viewing distances IP Fr...

Страница 7: ...Hanging system Stacking system MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H...

Страница 8: ...4 60kg 16A 8 tiles of MC 7H AC 220V 4 tiles of MC 7H AC 110V Name Part No Dimension Weight Max Length CAT 5 208004S0194 30m 1 40kg 100m Name Part No Dimension Weight Evision 201000S0009 L480 x W240 x...

Страница 9: ...hanging installation B Level adjusting screw C Location Pin For stacking installation D Vertical connection lock Note Ring and Location pin can be removed and exchange with each other Before hanging i...

Страница 10: ...irection of the horizontal connectors and make sure one red and one blue on the top side 0 degree 2 Install the base bar with panels Install the base bar on the panels with touring frame And lock the...

Страница 11: ...installation please make sure the location pin is on the top of the bar Adjust the level adjusting screw and make the base bar keep horizontal on the ground Adjust the direction of the horizontal con...

Страница 12: ...of di erent installation Adjust the knob and make sure the base truss horizontal Lock of base truss Case 1 Case 1 Adjust the knob and make sure the base truss horizontal Lock of base truss 3 Rear supp...

Страница 13: ...13 Case 1 Case 2 Touring frame Rear support truss Rear bridge Base bar Base truss Stacking system 4 Panel installation...

Страница 14: ...lign them pic5 4 Keep the connecting button on 0 degree pic5 5 Push handle back for locking pic7 Picture 1 Picture 2 Picture 3 Picture 4 Picture 5 Picture 6 Picture 7 Finish MC 7H panles Curve Install...

Страница 15: ...15 0 degree 10 degree stacking installation hanging installation stacking installation hanging installation 10 degree stacking installation hanging installation...

Страница 16: ...king voltage Power 100 240V AC 20W Working temperature 20 C to 45 C Input port DVI Output ports number 4 ports Communication port USB RJ45 2560 1024 Max resolution 2560 1024 1024 Data transmission por...

Страница 17: ...between the receiving cards 2 The pins on the receiving card is curved or broken Disconnected the UTP cable between the receiving card and the panel Blue 2Hz second Red Always Red 2Hz second Green Alw...

Страница 18: ...Package 09 18 8pcs LED panels per Flightcase 24pcs LED panels per T Dolly Pictures Flightcase T Dolly...

Страница 19: ...ROE Visual Co Ltd No 1 3 Floor Bldg 7 Zhong Yuntai Technology Industrial Park Songbai Road Shiyan Street Baoan Shenzhen China Tel 86 0755 83924892 Fax 86 0755 83924891 E mail roe roevisual com www ro...

Отзывы: