
- 14 -
Physical Connection:
06
Straight installation
Horizontal connector operation
1. Press the red button to loosen the handle.(pic1)
2. Pull the handle to turn the connecting bar.(pic3)
3. Connect two panels and align them.(pic5)
4. Keep the connecting button on “0 degree”.(pic5)
5. Push handle back for locking.(pic7)
Picture 1
Picture 2
Picture 3
Picture 4
Picture 5
Picture 6
Picture 7
Finish
MC-7H panles
Curve Installation(stacking and hanging)
Our touring system can make 10 degrees curve installation horizontally.
Befor installation, please adjust the horizontal connectors on base bars and panles’ touring frames.
Base bar