background image

 

20 

 

E10037-180424 

 

PROBEX 

2.7 

TESTING PROCEDURE 

STEP 1.  Turn on the readout unit and wait long enough for the probe to reach temperature 

equilibrium with the surrounding rock (15 min typ.) 

STEP 2.  The dual-action piston must be in the completely retracted position. 

STEP 3. Set the manual pump control valve handle to position 1, ensure that the cyclic test 

valve is open. 

STEP 4.  Load the rock mass by stress control steps, typically 10 increments of 3 MPa up 

to 30 MPa. At each step, pressure and volume are recorded after a one-minute 
stabilization  period  for  test  duration  of  about  10  minutes.  These  steps  can  be 
smaller when working in a very soft rock, or when the borehole is very large. 

STEP 5.  If an unloading phase is required, close the cyclic valve and strike the handle of 

the  pump  valve  from  position  1  to  2.  Open  slowly  the  cyclic  valve  for  reducing 
pressure. For increasing the pressure, strike the handle of the pump back in the 
position  1,  and  re-apply  some  pressure  while  opening  the  cyclic  valve.  It  is 
suggested to practice cyclic loading with the probe in the calibration tube before 
attempting it during a test.  

STEP 6.  When the test is complete, deflate the probe by pumping with the control valve 

handle in position 2. The dual-action piston will be fully retracted when the readout 
shows a zero reading. 

STEP 7.  Withdraw the PROBEX from the hole or move it to the next testing position. Note 

that tests are normally carried out from lowest testing elevation upward.

 

Standard 

spacing between tests is 1.5 m.  Inflatable membrane should not be located closer 
than 0.5 m from the top of the rock or from the bottom of borehole. 

 

Typical PROBEX Calibration and Test Results from the PROBEX  

 

 

 

Содержание PROBEX

Страница 1: ...sonnel Its misuse is potentially dangerous The Company makes no warranty as to the information furnished in this manual and assumes no liability for damages resulting from the installation or use of t...

Страница 2: ...D TURNING ON DP BOX 8 2 2 4 USING THE DP BOX READER APPS 9 2 3 SATURATION OF THE PROBEX 15 2 4 CALIBRATION OF THE PROBEX 16 2 4 1 PRESSURE LOSS CALIBRATION 16 2 4 2 VOLUME LOSS CALIBRATION 16 2 5 BORE...

Страница 3: ...core as well as cylinder E In order to inflate or deflate the PROBEX probe the manual hydraulic pump acts on the dual action hydraulic module The dual piston identified by letters F G and H is the mov...

Страница 4: ...2 E10037 180424 PROBEX Schematic Representation of the PROBEX Potentiometer...

Страница 5: ...ater side of the piston F is slightly larger than the area of the hydraulic oil side by a ratio of 95 5 this due to the area of rod G which represents 4 5 of the piston area The water pressure which a...

Страница 6: ...d the deflation line a working pressure of 32 5 MPa 1 4READOUT UNIT The model DP BOX is a portable datalogger equipped with rechargeable batteries It directly provides the volume and pressure changes...

Страница 7: ...k connects must be aligned for connection Then turn the ring to misalign the ball and the notch in order to prevent accidental disconnection when inflating the PROBEX This will prevent the PROBEX from...

Страница 8: ...6 E10037 180424 PROBEX PROBEX Assembly Thread this end of tubing cable through sufficient number of casing lengths to reach maximum testing depth...

Страница 9: ...n be uploaded to a laptop via USB communication The DP Box comes in a convenient water proof enclosure and is fitted with two 12 V rechargeable batteries providing over 8 hours of autonomy in normal c...

Страница 10: ...om using the DP Box the DP Box READER Application should be installed on a Tablet This application can be downloaded from Roctest web site 2 2 3 CONNECTING AND TURNING ON DP BOX Connect the electrical...

Страница 11: ...uetooth communication between the DP Box and the Tablet which will be confirmed when the DP box LED will blink quicker see below for more information 2 2 4 USING THE DP BOX READER APPS The DP Box Appl...

Страница 12: ...the DP BOX which takes a few seconds The name of the DP Box will then replace the Scanning inscription Used for configuring and running a testing session Used for configuring and running a calibration...

Страница 13: ...ument Add a New Instrument and Select the Type of instrument PROBEX and enter the serial number appearing on the control unit e g 003717003 The DP Box name should appear here Select for additional fun...

Страница 14: ...ry calibration at the bottom of the screen Finally select this instrument Set the date and time of the Tablet if necessary Go in Quick Readings and press the green icon for reading the sensors Two typ...

Страница 15: ...cted ID Once setup is completed select Begin Calibration or Test to start Once calibration or testing is started a window like the one below will be displayed After saving the initial readings the ope...

Страница 16: ...select the specific file you want to see For starting the timer Readings are automatically recorded each time timer gets to zero Graph is plotted here Displays actual Pressure and Volume readings For...

Страница 17: ...If so please contact Roctest 2 3SATURATION OF THE PROBEX An adequate water saturation of the PROBEX probe and cylinder E is necessary before using the equipment Sometime the probe is delivered pre sa...

Страница 18: ...calibration must be done a single time when using a new membrane The procedure consists of STEP 1 Once the whole system is saturated place the probe horizontally at ground level next to the pump Infl...

Страница 19: ...from 30 to 15 MPa and then back to 30 MPa At each step of pressure record the corresponding volume displayed on the readout unit after one minute Then deflate the membrane Ensure that the last two ca...

Страница 20: ...al connections to the manual pump and readout unit and check that the whole system is working well by inflating and deflating the probe Check the battery charge STEP 5 Insert the PROBEX into the boreh...

Страница 21: ...19 E10037 180424 PROBEX Methods Used for Lowering Probe in Place Slotted adapter NQ to AW Rods or BW Casing to NQ Rods...

Страница 22: ...ve and strike the handle of the pump valve from position 1 to 2 Open slowly the cyclic valve for reducing pressure For increasing the pressure strike the handle of the pump back in the position 1 and...

Страница 23: ...e V volume increase P Corrected pressure increase between P1 and P2 V Corrected volume increase between P1 and P2 Pressure and volume are corrected as follows P Pr Pl Pc Where P Corrected pressure Pr...

Страница 24: ...to run a volume calibration after a test if the operator has any reason to believe that the factor c might have changed Volume of the probe at rest Vo Vo is theoretically 1950 cm3 considering the theo...

Страница 25: ...ier is recommended The borehole needs to be very tight Finally de aired water should be used for reducing the deformation of the probe Additional information can be found in document 7 cited below 4 2...

Страница 26: ...of bursting is high when the borehole is very large or when the tested material is very soft the operator should reduce the pressure increments to 2 1 or 0 5 MPa for instance in order to obtain maximu...

Страница 27: ...away from the steel core It will slide on the O rings No 5 mounted at both ends of the steel core No 3 and the water contained in the annular space between the core and the membrane No 14 will flow o...

Страница 28: ...SS PIECE Membrane Diameter With use the PROBEX membrane will deform in a plastic way resulting in a diameter increase This phenomenon will not invalidate test results but may prevent PROBEX insertion...

Страница 29: ...ver 40 C However always keep the PROBEX out of direct sun The use of a canopy is ideal Try to avoid significant thermal changes on the probe If inevitable let the probe stabilize in temperature at the...

Отзывы: