14
15
192321752028000
Страница 1: ...tructions 2 Chapter 2 Introduction to the Rear Panel 4 2 1 Rear Panel Descriptions 4 Chapter 3 Installation and Operation 5 3 1 Unpacking 5 3 2 Selecting Installation Position 6 3 3 Installation of Ca...
Страница 2: ...y damage to the battery bank if foreign objects are deliberately or accidentally inserted into the battery bank enclosure The battery will discharge naturally if the system is unused for a period of t...
Страница 3: ...on Retain the packing material for future use 3 1 Unpacking 3 1 1 Take the battery bank out of the PE foam 3 1 2 Remove the packing materials Note The battery bank module is approx 120 kgs be cautious...
Страница 4: ...e air flow to the ventilation openings of the unit 3 2 3 Please ensure the installation site environmental conditions are in accordance with the battery bank working specifications to avoid overheat a...
Страница 5: ...OUTPUT INPUT ON OFF S1 Ext Battery G Parallel Work Comm TNV Communication Network Bus Not Intended to EPO RS232 CB 1 Utility Input Breaker To UPS Batte ry To Extended Ba ttery G G DC Breaker 30A 250V...
Страница 6: ...10 Step 3 Step 4 11 Step 5 Step 6...
Страница 7: ...orage through moderate climate 15 to 30 C 5 to 86 F the batteries should be charged for 12 hours every 6 months by plugging the UPS power cord into the wall receptacle Repeat this every 3 months under...
Страница 8: ...14 15 192321752028000...