![rocpower Rocforce Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/rocpower/rocforce/rocforce_user-manual_1476252004.webp)
6
3.2. Selecting Installation Position
It is necessary to select a proper environment to
install the unit, in order to minimize the possibility of
damage to the battery bank and extend the life of the
batteries. Please follow the instructions below:
3.2.1. Keep at least 20cm(8 inches) clearance from
the rear panel of the battery bank from the
wall or other obstructions.
3.2.2. Do not block the air-flow to the ventilation
openings of the unit.
3.2.3. Please ensure the installation site
environmental conditions are in accordance
with the battery bank working specifications
to avoid overheat and excessive moisture.
3.2.4. Do not place the battery bank in a dusty or
corrosive environment or near any
flammable objects.
3.2.5. This battery bank is not designed for outdoor
use.
3.3. Installation of Casters Cover and Rack/Tower kits
B1 B2 S3
S2
S2
A1
A1
S1
A2
S2
7
3.4. Installation Instructions
C1
OFF
ON
Step 1
ON
OFF
Step 2
Step 3
C2
Step 4
UPS
First Battery Bank
Second Battery Bank
Содержание Rocforce
Страница 6: ...10 Step 3 Step 4 11 Step 5 Step 6...
Страница 8: ...14 15 192321752028000...