background image

6

Rockwell Automation Publication 1608M-IN002A-EN-P - January 2016

MegaDySC Dynamic Voltage Sag Corrector

System Clearance

The MegaDySC doors are hinged on the left, and clearance must be given to allow the door to swing open 90 degrees to the front of the enclosure.

Clearance for the Automatic Bypass switchboard must allow the front panels to swing (left side hinged) open 90 degrees to the front of its 
enclosure.

Only front side access to the Automatic Bypass switchboard will be required during installation wiring and cabinet interconnect wiring.

System Mounting

The MegaDySC system is floor-mounted, and should be secured using the 0.63” diameter mounting holes provided along the bottom channels. The 
MegaDySC section is provided with all necessary interconnect wiring to the Automatic Bypass switchboard section. Proper line-up is critical: The 
MegaDySC section must be to the right of the Automatic Bypass section when viewed from the front of the system. 

The DySC 400A Module MegaDySC section is shipped separately from the Automatic Bypass switchboard. The MegaDySC section must be 
secured to the Automatic Bypass enclosure with the 3/8” hardware supplied. See 

Figure 3

 for fastening locations and hardware arrangement. The 

optional ER enclosure is permanently connected to the MegaDySC section prior to shipment.

Figure 3 - System Mounting

Attach the MegaDySC section to the Automatic Bypass 
switchboard using the six sets of 3/8” hardware supplied.

• Install three sets along the front door frame and three sets 

along the rear frame. Hardware along the rear frame can be 
omitted if rear access to the switchboard is not available: it 
is necessary to remove the rear panel of the switchboard to 
install the rear sets of hardware. 

• Install bolts from the switchboard side and thread into the 

weld nuts in the MegaDySC section enclosure. 

• Each set consists of one 3/8-16 x 1.0” bolt, one 3/8 split lock 

washer and one 3/8” flat washer, assembled as shown. 

Содержание Allen-Bradley MegaDySC 1608M Series

Страница 1: ...equipment The MegaDySC system provides instantaneous dynamic sag correction to help your equipment ride through these common events It connects normal utility power directly to the load until a volta...

Страница 2: ...ncati nella sezione Altre risorse riguardanti l installazione la configurazione ed il funzionamento dell apparecchiatura Gli utenti devono leggere e comprendere le istruzioni di installazione e cablag...

Страница 3: ...nment freeofconductive contaminants Avoid installing the MegaDySC system directly near heat emitting equipment such as ovens heaters or furnaces Ambient temperature must not exceed 40 C 104 F Do not o...

Страница 4: ...mic Voltage Sag Corrector SystemLayout Figure 1 Standard Run SR System Layout 12 7 21 5 1 29 723 2 81 7 6 5 48 5 25 167 7 21 6 7 2 5 167 7 21 5 7 6 5 1 5 1 6 12 7 21 6 3 66 167 7 21 5 48 5 25 5 48 5 2...

Страница 5: ...ic Voltage Sag Corrector Figure 2 Extended Run ER System Layout 12 7 21 5 1 29 723 2 81 7 6 5 48 5 25 167 7 21 5 7 1 581 5 7 6 5 48 5 25 5 1 5 48 5 25 02 8 12 7 21 6 5 1 6 7 2 5 167 7 21 167 7 21 6 3...

Страница 6: ...must be to the right of the Automatic Bypass section when viewed from the front of the system The DySC 400A Module MegaDySC section is shipped separately from the Automatic Bypass switchboard The Meg...

Страница 7: ...t This cable harness is routed through two large holes one in the ABP cabinet and one in the MegaDySC cabinet at the bottom front of the cabinets The harness is plugged into the associated terminal bl...

Страница 8: ...the control cable harness from the lower front switchboard pan into the MegaDySC section through the matching holes in the lower front side panels Install the 3 5 snap in grommet so that it protrudes...

Страница 9: ...21 25 87 7 1387 287387 5 029 723 3 1 72 5 1 25 381 175 5 21 6 520 520 5 5 520 7 7 51 7 27720 175 5 21 25 87 7 1387 287387 6 7 6 0 6 723 3 1 37 7 225 3 1 6 127 5 029 87 7 1387 0 0 3 5 3 6 287387 72 35...

Страница 10: ...tor Communication on page 12 MegaDySCSystemInterconnectionsChecklist Connect the Automatic Bypass ABP Switchboard to MegaDySC ground cable to the vertical strut in the MegaDySC cabinet at the location...

Страница 11: ...open removing power from the MegaDySC cabinet voltage sag correction will then be disabled This feature can be used as an Emergency Power Off EPO function for the MegaDySC cabinet Power to the output...

Страница 12: ...pass switchboard and is pre wired to monitor the MegaDySC input and output voltages The i Sense Ethernet and Modem communication ports are internally connected to the RJ45 and RJ11 jacks respectively...

Страница 13: ...ut power in the sequence OFF ON OFF ON within a one minute period will cause a Limit Cycle Timeout alarm In such case sag correction will be disabled for one minute after which the alarm will automati...

Страница 14: ...t rated for DC loads max allowable 2 DC loading Voltage Waveform Sine wave Voltage Sag Correction Times Single Event 3 phase 87 to 50 voltage remaining 5 s All three phases to zero voltage remaining 5...

Страница 15: ...Heat Loss Btu h Efficiency 480V SR 2421 8270 99 480V ER 2852 9740 99 380V SR 2321 7925 99 380V ER 2624 8960 99 3 wire 4 wire SR ER MegaDySC MegaDySC ER Weight Automatic Bypass Switchboard Weight Total...

Страница 16: ...We Doing form at http literature rockwellautomation com idc groups literature documents du ra du002_ en e pdf Technical Support Center Knowledgebase Articles How to Videos FAQs Chat User Forums and P...

Отзывы: