
16
Rockwell Automation Publication 150-UM009E-EN-P - August 2021
Chapter 2 Installation and Wiring
Figure 7 - Diagram and Power Connections; Motor Wiring—3-lead Line-connected Motors
3 LEAD MOTOR CONNECTIONS
STARTER
TERMINALS
MOTOR
TERMINALS
T6 T4 T5 JUMPER
1 2 3 N/A
MOTOR
T6 T4 T5
1
2
3
[1]
[2]
[3]
Incoming Line Connections
SMC CONTROL
W
IRES
1 — Contol Po
w
er (L1)
2 — Contol Common (L2)
4 — Start Enable
13 — Up-To-Speed Indication
234A ONLY
T1 T2 T3
T6 T4 T5
L1 L2 L3
L1 L2 L3
A1 A2 IN1 IN2 97 98 13 14
1 2
(A2) (A1)
FC
13
4
110/120V
JUMPER
220/240V
FAN
FAN
1 2 3 4
1 2 3 4
1 2
1 2
A1 A2 IN1 IN2 97 98 13 14
2/T1 4/T2 6/T3
1/L1 3/L2 5/L3
1/L1 3/L2 5/L3
T6 T4 T5
L1
L2
L3
[1]
[2]
[3]
L1
L2
L3
T1
T2
T3
T6
T4
T5
(2)
(T1)
FC
FC
FC
(2)
(T1)
(1)
(L1)
(4)
(T2)
(3)
(L2)
(5)
(L3)
(6)
(T3)
T1/2 L1/1
T2/4 L2/3
T3/6 L3/5
FC
SMC
Содержание Allen-Bradley 150-E
Страница 1: ...User Manual Original Instructions Elevator Panel Solution Bulletin 150 E ...
Страница 30: ...30 Rockwell Automation Publication 150 UM009E EN P August 2021 Appendix A History of Changes Notes ...
Страница 31: ...Rockwell Automation Publication 150 UM009E EN P August 2021 31 Elevator Panel Solution User Manual Notes ...