Pg 16
Pg 17
MACHINE INSTALLATION - ALL MODELS
1. Ensure the machine is unpackaged and placed on a hard and
stable surface near an adequate power supply.
2. Remove the water reservoir cover and fill the reservoir with filtered
water, pouring from a very clean water jug with a spout that is
easy to pour from. Be careful to pour water into the water reservoir
only (to remove the reservoir for cleaning see maintenance
instructions). Replace the cover of the water reservoir.
3. Connect machine to power supply that is rated in accordance with
the serial plate on the espresso machine.
4. Turn the on/off switch (4) to the ‘on’ position ‘1’ and open the steam
handle (1). Boiler water fill begins – you will hear the pump’s noise.
5. When the boiler is properly filled with water, the pump will stop
(you can tell this as the noise will cease). Now close the steam
handle.
6. The heating up of the boiler begins.
7. Wait until the boiler pressure gauge (3) reads approximately 1 bar.
8. Now open the steam handle (1) for 5 seconds to allow some
steam to release. This operation is very important as it removes a
possible vacuum inside the boiler which could result in the suction
of milk inside the boiler once starting to steam milk. Close the
steam handle (1) again.
9. Wait until the boiler pressure gauge (3) reaches 1 bar again.
10. Lift the brew lever (9) completely up.
11. Release a cup of hot water from the brewing group head (6) for
the first use only.
12. Push the brew lever (9) down completely to stop water from
flowing.
13. Now the machine is ready for operation.
14. Allow 15–18 minutes warm up time so the group head is thoroughly
heated – the quality of the espresso will be much better with a hot
group and hot portafilter handle.
PROGRAMMING YOUR R 58 / R 60V
Your R 58 / R 60V machine is factory set to optimum working
parameters. Nevertheless you can set your personal parameters
using the remote controller (with display) that you can connect to
your machine.
It is important that the R 58 / R 60V is turned OFF when connecting
or disconnecting the remote controller display. If you are using the
machine with the remote controller attached ensure that the display
is properly connected to the machine.
FACTORY SETTINGS OF YOUR MACHINE
Prior to delivery your Rocket R 58 / R 60V espresso machine has been
tested. The factory settings mean that your machine is set and ready
for use. Please find here below the settings. To change the settings
please refer to the user instructions.
•
Operation: Pour over (water reservoir)
•
Service boiler: Heating on, set to 123°C
•
Brew boiler: The temperature of the coffee water brew boiler is
set to 105 °C
R 60V PRESSURE PROFILE SETTINGS
•
Pressure Profile A
6” – 4 Bar
18” - 9 Bar
6” - 5 Bar
•
Pressure Profile B
8” - 4 Bar
22” – 9 Bar
•
Pressure Profile C
20” – 9 Bar
10” – 5 Bar