background image

A392111320h

Roca Sanitario, S.A.

Avda. Diagonal, 513
08029 Barcelona
SPAIN
www.roca.com.au/

See user manual

ON

2

1

120 s.

OPEN

POWER

3

CONNECT

4

AUTO-TEST

5 s.

After connecting the power       , you have 60 seconds to link the remote control.

To link the remote control       , press simultaneously the 

Drying 

and 

Stop

 buttons on the remote control for 5 seconds. 

A beep will be heard and all the LEDs on the remote light up, as a signal that it is connected.

A self-calibration process starts for 120 seconds       during which water flows from the e-bidet nozzle window.

2

3

4

Max. 60 s.

23

24

Содержание IN-WASH INSPIRA SMART CC BTW A80306100R

Страница 1: ...IN WASH INSPIRA SMART TOILET CC BTW A80306100R 5 5 ...

Страница 2: ...2 ...

Страница 3: ...s maintained Do not use a water supply hose other than the one provided with this product Make sure that this product is correctly earthed to ground If the product is not earth connected there is a risk of electric shock Dual check valve must be fitted before cistern stop Please note that this product has an Integral High Hazard Backflow Prevention device that meets the requirements outlined in AS...

Страница 4: ...4 400 445 480 790 380 55 680 390 Alternative drainage connections Included Min 125 Max 225 225 180 mm ...

Страница 5: ...5 X2 X2 X2 S M L X1 X1 X1 1 2 H 3 4 H C X2 X2 X2 X1 X1 X1 X1 X1 1 2 H 3 8 H A X2 X2 X2 X1 X1 X1 X1 X1 X2 X2 X2 X2 X1 X1 B 3 8 M 1 2 H ...

Страница 6: ...6 200 Ø1 2 500 kPa Option 1a Option 1b 300 200 Ø1 2 300 Do not use rain water Use only potable water Electrical 2 Pipes 1 Option 2a Option 2b 55 125 55 125 3 x 1mm2 L 300 mm ØMin 6 mm ØMax 8 5 mm ...

Страница 7: ...r cable consisting of 3 wires active neutral earth of at least 1mm2 The connection must be done inside an IPX4 or better junction box If it is necessary to replace the power cable this must be done by qualified service staff C 240V 50Hz Note Any electrical work conducted on this product must be installed only by qualified personnel in accordance with AS NZS 3000 Wiring Rules Please consult with a ...

Страница 8: ...8 2 1 3 Min 45 1 Ø12 45 90 10 250 360 2 1 ...

Страница 9: ...9 Water filter support Install the water filter on the most accessible side a b 3 4 ...

Страница 10: ...10 B 1 2 H 3 4 H L 515 C 3 8 H 1 2 H L 560 A External connection 3 8 M 1 2 H L 610 B 3 8 M 1 2 H 1 2 H 3 4 H C 1 2 H 3 8 H A 1 2 3 5 6 ...

Страница 11: ...11 1 2 3 OFF L Min 300 mm Neutro Neutral Neutre Neutralleiter Tierra Ground Terre Schutzleiter ɇɨɥɶ Neutro Zero 6WĜHGQt YRGLþ 1 9LYR 9LYR 9LYR Phase Ɏɚɡɚ Fase Plus Fáze Ɂɟɦɥɹ Terra Uziemienie 8 HPČQt 7 ...

Страница 12: ...12 A 1 2 H 3 8 H A 2 3 1 OFF Option 1a 2a Included Note Dual check valve must be fitted before cistern stop 8 9 ...

Страница 13: ...13 B C Internal connection B 3 8 M 1 2 H 1 2 H 3 4 H C 1 x2 2 17 11 10 ...

Страница 14: ...14 1 2 3 Gray 4 5L Blue 3L 205 mm 2 4 B 3 1 12 13 ...

Страница 15: ...15 1 3 2 1 C 2 3 4 5 14 15 ...

Страница 16: ...16 1 2 3 3 2 1 16 ...

Страница 17: ...17 3 4 6 2 1 3 5 17 18 ...

Страница 18: ...18 3 2 1 19 20 ...

Страница 19: ...19 Optional Included CR 2032 x2 X X 2mm A X 3mm B X 4mm C Max 1mm 21 22 ...

Страница 20: ... you have 60 seconds to link the remote control To link the remote control press simultaneously the Drying and Stop buttons on the remote control for 5 seconds A beep will be heard and all the LEDs on the remote light up as a signal that it is connected A self calibration process starts for 120 seconds during which water flows from the e bidet nozzle window 2 3 4 Max 60 s 23 24 ...

Отзывы: