UHD L
OW
P
ROFILE
D
UCT
F
URNACE
I
NSTALLATION
O
PERATION
AND
S
ERVICE
M
ANUAL
44 of 47
SECTION 16: SPECIFICATIONS
16.1 Dimension Data
Model
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
T
UHD[X][S]
75
in
(cm)
28.5
72.4
17.6
44.7
20.3
51.6
17.6
44.7
16.6
42.2
1.25
3.2
6.3
16.0
6.1
15.5
2.8
7.1
1.6
4.1
3.4
8.6
6.7
17.0
18.2
46.2
5.5
14.0
4.4
11.2
6.8
17.3
1.8
4.6
32
81.3
UHD[X][S]
100
in
(cm)
28.5
72.4
22.6
57.4
20.3
51.6
17.6
44.7
16.6
42.2
1.25
3.2
7.0
17.8
6.0
15.2
2.4
6.1
1.6
4.1
3.4
8.6
6.7
17.0
18.2
46.2
6.3
16.0
4.4
11.2
6.8
17.3
1.8
4.6
37
94
UHD[X][S]
125
in
(cm)
28.5
72.4
22.6
57.4
20.3
51.6
17.6
44.7
16.6
42.2
1.25
3.2
7.0
17.8
6.0
15.2
2.4
6.1
1.6
4.1
3.4
8.6
6.7
17.0
18.2
46.2
6.3
16.0
4.4
11.2
6.8
17.3
1.8
4.6
37
94
Содержание Combat UHDXS 100
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 29: ...SECTION 9 GAS PIPING 21 of 47 Figure 14 Gas Connection ...
Страница 43: ...SECTION 14 TROUBLESHOOTING 35 of 47 14 1 General ...
Страница 54: ...UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL 46 of 47 ...
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......