SECTION 5: H
EATER
I
NSTALLATION
9
SECTION 5: HEATER INSTALLATION
5.1 General
Heaters are designed for installation above 2.5 m.
These heaters must be installed within the heated
space. Duct delivery systems are not permitted with
axial fans.
5.2 Handling
All CTU heaters are supplied secured to a wooden
pallet and shrink wrapped. Use the pallet to support
the heater during handling and installation. When
handling or supporting the heater from below,
ensure that the weight is taken at the support points.
5.3 Shelf Mounting and Suspension
WARNING
Crush
H
a
z
ard
Use
10
mm
steel
drop
rod
minimum.
Failure
of
the
supports
can
result
in
death,
injury
or
property
damage.
For typical suspension
See Page 9, Figure 2
.
Figure 2: Suspension Methods
10
mm
Steel
Drop
Rod
W
asher
Nut
Unistrut
Channel
Nut
Cone
Point
Set
Pin
W
indow
Clamp
Unistrut
10
mm
Steel
Drop
Rod
Nut
W
asher
Riv
Nut
Support
Points
I
nsure
all
suspension
hardware
is
torqued
to
a
minimum
of
27
Nm
(
20
ft
lbs)