5
Picture
11
-
1
6.Installation of aluminum foil's air duct:
Installation of without check valve:
Firstly,insert the aluminum foil's air duct with fixed bar between the inner and
external rings of check valve vent, fasten it by ST3x10 tapping screw. Then fasten another side of aluminum foil's air duct
with adhesive tap outside of room.When the wall's hole is bigger than air duct, the air duct can be pulled out of room
directly;when the wall's pipe is smaller than air duct, there are four specifications for the interface of air duct, such as
140mm,150mm,160mm and 170mm.The operator can select reasonable specification according to wall's hole. The
additional part can be cut with forfex.
(
The detail as following picture),if the duct should connect with public smoke
flue,please first straighten out the duct,then connect with flue.
Φ
175
aluminum
foil
'
s
air duct
Φ
1
8
0
Φ
1
7
0
Φ
1
6
0
Φ
1
5
0
Φ
1
4
0
Picture
11-2
Check
valve
Seal
ring
of
check
valve
ST4X18 screws
Installation of with check valve:
Firstly,insert the aluminum foil's air duct into the external rings of check valve
vent, fasten it seal tape. Then put 4 buckles in the check valve into the slots,turn with clockwise and fix the duct with the
check valve vent.
Then fasten another side of aluminum foil's air duct with adhesive tap outside of room.When the wall's hole is bigger
than air duct, the air duct can be pulled out of room directly;when the wall's pipe is smaller than air duct, there are four
specifications for the interface of air duct, such as 140mm,150mm,160mm and 170mm.The operator can select
reasonable specification according to wall's hole. The additional part can be cut with forfex.
(
The detail as following
picture),if the duct should connect with public smoke flue,please first straighten out the duct,then connect with flue.
Body
of
machine
Check
valve
Check valve interface
ST4X18 screws
Seal
ring
of
check
valve
Φ
175
aluminum
foil
'
s
air duct
Adhesive
tape
Φ
175
air duct
'
s
interface
Φ
1
8
0
Φ
1
7
0
Φ
1
6
0
Φ
1
5
0
Φ
1
4
0
Adhesive
tape
Slot
Body
of
machine
Fixed
bar
of
air
duct
ST3X10 screw
Adhesive
tape
Φ
175
air duct
'
s
interface
cut
addi tional
par t
whi ch
sm al ler
than
wal l
'
s
hol e
Notice
:
Please
straighten
the
aluminum
foil
'
s
air duct
when
installing
this
product
to
avoid
noise
under
incompletely
straight
condition
.
The
additional
air duct
can
be
cut
by
wire
-
cutter
.
Notice
:
Please
straighten
the
aluminum
foil
'
s
air duct
when
installing
this
product
to
avoid
noise
under
incompletely
straight
condition
.
The
additional
air duct
can
be
cut
by
wire
-
cutter
.
cu t
ad di tion al
pa rt
whi ch
sma ller
tha n
wal l
'
s
ho le
Buckle
7
. Installing other end of exhaust duct (for reference)
Installing with exhaust tube and range hood against the window:
replace a piece of window glass with plywood with ventilation holes or drill holes directly on the glass.
In case range hood kept away from the window:
Choose the window nearest to the hood and with outdoor access for installing the exhaust tube; or drill holes
on the wall nearest to the hood and with outdoor access to install the exhaust tube through the wall.
Drilling holes through wall:
Align properly the positions of exhaust tube against the wall and scribe the holes on the wall (circles slightly
larger than the exhaust tube diameter),then drill the wall by long drill bit.Please take care of the wall
structure and materials to prevent damage of wall other than the wall holes.
The hole diameter on the wall shall be near to that of the exhaust tube and shall not be too small.
Otherwise, it will lead to obstructed exhaust, higher noise and lower air flow rate,noisy.The
connection part from the duct and the flue should be well sealed,make sure the duct,check valve vent
and the flue well fixed,and check the valve from the check valve or flue switched smoothly;
吸油烟机
Range
Hood
Содержание CXW-200-A808
Страница 1: ...A808 Operation Manual Range Hood CXW 200 A808 CXW 200 A816 ...
Страница 12: ...Edition A 3 ...